Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Deer Valley Road, El Mirage to 109th Avenue
Bidding
Phoenix, AZ 85038

System Preservation
Bidding
Less than $14,600,000 est. value
Avondale, Phoenix, Tolleson, AZ

Paving and Resurfacing of Streets
Post-Bid
Tempe, AZ 85280

2019 Mill and Overlay Project
Post-Bid
Scottsdale, AZ 85256

2nd Avenue Streetscape 2nd Avenue Between Morris and Robson
Results
$50,000 to $60,000 est. value
Mesa, AZ 85211

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Installation of Mitigation Devices - Speed Cushions
Bidding
$40,000 to $50,000 est. value
Goodyear, AZ

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

35th Ave, Carver to Elliot
Bidding
AZ

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Last Updated 04/27/2021 11:35 PM
Project Title

Mesa Falcon Field Airport Reconstruct Higley Ramp

Physical Address View project details and contacts
City, State (County) Mesa, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,700,000 to $3,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: The project will consist of 3 phases. Each phase will consist of reconstructing a portion of the ramp to the limits shown in the project plans. The existing asphalt and base materials will be removed, and a new pavement section will be constructed. The existing aircraft tie-downs in all phases will be removed prior to the pavement removal operation and new aircraft tie-downs will be installed after the new pavement section is constructed. Temporary and permanent pavement markings will be applied to the new asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents