Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

Ting Stadium Structure and Drainage Repair
Renovation, Infrastructure
Bidding
Holly Springs, NC 27540

Asphalt Patching and Pavement Repair
Infrastructure
Bidding
Raleigh, NC

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Historic Christian Church Parking Lot Project
Results
Morrisville, NC 27560

2019 Street Improvement Project
Results
Less than $708,000 est. value
Holly Springs, NC

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Harper Park Playground
New Construction, Infrastructure - 15,000 SF
Bidding
$175,000 est. value
Knightdale, NC 27545

Group 2 Sidewalk Improvements Project
Post-Bid
Raleigh, NC

Bike, Sidewalk and Pedestrian Improvements
Results
Less than $1,090,168 est. value
Cary, NC 27513

Varsity Drive Parking Lot Expansion
Infrastructure
Bidding
$5,500,000 est. value
Raleigh, NC 27616

Group 2 Sidewalk Improvement Project (Formal)
Post-Bid
Raleigh, NC

Asphalt Repair and Resurface
Term Contract
Results
Raleigh, NC 27610

Asphalt Project - State Surplus
Infrastructure
Bidding
Raleigh, NC 27607

Last Updated 12/08/2021 03:11 PM
Project Title

Utley Creek Greenway Connection

Physical Address View project details and contacts
City, State (County) Holly Springs, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $986,758
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes 1,500 linear feet of new 10’ wide asphalt trail construction (10-foot wide asphalt, 2 foot shoulders), 100 linear feet of prefabricated steel bridge construction (2 @ 50 feet), associated clearing, drainage, erosion control, signage and approximately 1,350 linear feet of repair and repaving of existing asphalt trail. Minority firms are encouraged to submit proposals. Project Location: From Morgan Park Subdivision to Ballentine Street.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Clearing and Grubbing, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents