Similar Projects
Installation of Needlepoint Bipolar Ionization Units Phase III 37 CMS Sites
Alteration
Bidding
Charlotte, NC 28208

HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC 28277

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

Grady Cole-Electrical Modifications and HVAC Replacement Project
Results
Charlotte, NC

Terminal Basement Condenser Water Loop
Results
Charlotte, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

80 Ton Chiller
Post-Bid
Charlotte, NC

Gantt Center and Bechtler Museum Humidifier Upgrades
Results
Less than $500,000 est. value
Charlotte, NC 28202

UNCC HVAC, Plumbing and Electrical Repairs - McEnir
Alteration
Post-Bid
Charlotte, NC

Charlotte-Mecklenburg Government Center HVAC Replacement
Results
$20,400,000 est. value
Charlotte, NC 28202

DDC Pneumatic Uplifts and Commissioning Phase I
Alteration
Post-Bid
Charlotte, Matthews, NC 28215

Lee S. Dukes WTP HVAC Replacement
Results
Charlotte, NC

Replace 7 Rtu`S At J.V. Washam Elementary School
Alteration
Post-Bid
Cornelius, NC 28031

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Results
$773,508 est. value
Cornelius, NC 28031

Replace 13 Unit Ventilators, 2 Split Systems, and Existing Pneumatic Control Systems With Full Direct Digital Controls at South Charlotte Middle School
Alteration
Post-Bid
Charlotte, NC 28277

Reported 12/30/2021 12:00 AM
Project Title

Condenser Water Loop - Concourse E

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of this contract shall be to install a complete piping loop with several valves to allow for the connection to this temperature-controlled piping system with a heat exchanger to provide conditioned water to water cooled condensing units used for the food concessions restaurants walk-in coolers and walk-in freezer. Project term is 90 days.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Coolers, Walk-In Freezers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents