Similar Projects
Missouri River North Bank Stabilization Phase I
Infrastructure
Post-Bid
$600,000 CJ est. value
Great Falls, MT 59401

Bogert Place - Church to Story Street - SCR26 - City of Bozeman
Infrastructure
Conception
$402,000 est. value
Bozeman, MT 59715

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

Big Sandy Stormwater Improvements
Infrastructure
Post-Bid
Big Sandy, MT 59520

2022 Sewer Lining Project
Infrastructure
Post-Bid
Bozeman, MT

Dena Mora Rest Area Rehabilitation
Infrastructure
Results
MT 59830

Wyoming Street Storm Sewer Improvement Project
Infrastructure
Results
$600,000 est. value
Kalispell, MT

RFP D/B - Bridger Creek Flood and Erosion Control Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Bozeman, MT 59715

Davis-fowler Interceptor (Durston Road to West Oak Street) - WWIF22 - City of Bozeman
Infrastructure
Conception
$1,250,000 est. value
Bozeman, MT

Fox Reservoir #1 Replacement - City of Billings
Renovation
Conception
$3,250,000 CJ est. value
Billings, MT 59111

CCTV City Storm Drain
Infrastructure
Post-Bid
Billings, MT

Rehabilitation of the Existing Wastewater Collection
Infrastructure
Results
MT

Last Updated 09/24/2022 08:32 AM
Project Title

June 2022 Flood Recovery Projects

Physical Address View project details and contacts
City, State (County) Columbus, MT 59019   (Stillwater County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Engineering plans and copies of permits can be picked up at the Stillwater CD Office for detailed information on each project. At the Office of the Stillwater Conserva-tion District 334 North 9th Street Post Office Box 48 Columbus, Montana 59019. Stillwater Conservation District will make every effort to comply with such request. Insurance as required shall be provided by the success-ful Bidder(s) and a certificate(s) of the insur-ance shall be provided. Montana Prevailing Wage rates shall apply. The successful Bidder shall comply with all applicable Local, State, and Federal ordinances, regulations, and requirements. The successful Bid-der shall comply with all applicable Federal regulations and requirements, which include but are not limited to Section 3 Clause, Equal Opportunity Clause, Executive Order 11246 and 11624, Federal Labor Standards and Civil Rights Act. Accordingly, the Stillwater Conservation District reserves the right to negotiate an agreement based upon available project funds and fair and reason-able compensation for the scope of work and services proposed. Stillwater Con-servation District reserves the right to reject all bids. District also reserves the right to reject any and all nonconforming, non-responsive, unbalanced, or conditional bids, and to reject the bid of any Bidder if the Stillwater Conservation District believes that it would not be in the best interest of the Stillwater Conservation District to make an award to that Bidder. Stillwater Conservation District also reserves the right to waive informali-ties. Questions regarding the documents shall be sub-mitted in writing to Sharon Flemetis, EWP Project Manager, Stillwater/Carbon Conservation District, 334 N. 9th St, Columbus, MT, or by email to Sharon.fle-metis@mt.nacdnet.net The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents