Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 09/14/2020 04:10 PM
Project Title

Install Air Handling Units (AHUs), C&D Bay, Building 3

Physical Address View project details and contacts
City, State (County) Rome, NY 13441   (Oneida County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected October 2020
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, devices and materials and performing all work required to modernize HVAC systems. The work to be performed involves the following principal features: Upgrade air handling systems, modify/upgrade electrical systems to accommodate HVAC modifications, erect penthouse fan room. Capable sources are sought to replace the HVAC systems and erect penthouse at the Air Force Research Laboratory, Rome Research Site, Rome, NY. The anticipated period of performance is 300 days. The contractor shall furnish all labor, equipment, devices and materials and performing all work required to modernize HVAC systems. The work to be performed involves the following principal features: Upgrade air handling systems, modify/upgrade electrical systems to accommodate HVAC modifications, erect penthouse fan room. The contractor’s performance will be based on the Contracting Officer’s (CO) evaluation and Contracting Officer’s designated Representative (COR) The evaluation of results will be based on COR performance assessment, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents