Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
New Construction, Infrastructure - 525,000 SF
Design
$600,000,000 CJ est. value
San Jose, CA 95113

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Mt Eden Road Shoulder Stabilization Project
Infrastructure
Post-Bid
$105,900 est. value
Saratoga, CA 95070

Last Updated 12/08/2022 10:33 PM
Project Title

Little Uvas Creek Bridge 37C0095 Replacement on Uvas Road Bridge New Bridge 37C0601

Physical Address View project details and contacts
City, State (County) San Jose, CA 95113   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $7,692,579 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of Constructing one bridge, one box culvert and one retaining wall; realignment of 1800 feet of roadway; drainage system and removing a roadway bridge. Q & A deadline: Jul 14, 2022 7:00:00 PM EDT

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents