Similar Projects
Red Mountain High School Storm Pump Replacement
Infrastructure
Bidding
$125,000 est. value
Mesa, AZ 85207

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Pricing Drilling and Construction of Multiple Irrigation Wells
Post-Bid
Maricopa, AZ 85138

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Valentine Well
Results
Phoenix, AZ 85027

F--Bodaway-Gap Well Installation
Post-Bid
$100,000 to $300,000 est. value
Tuba City, AZ

Camp Well & Calhoun Well Drills
Results
$25,000 to $100,000 est. value
AZ

N--AZ-San Bernardino NWR-Replacement Wells
Post-Bid
$120,000 to $175,000 est. value
Douglas, AZ

Well Abandonment on FAIR
Results
$100,000 to $250,000 est. value
Whiteriver, AZ 85941

Job Order Contract (JOC) for Water Production Wells and Facilities
Term Contract
Post-Bid
$250,000 est. value
Show Low, AZ

Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Results
Gilbert, AZ 85297

WAPA DSW: Oil/Water Separator and Sewer Lift Preventative Maintenance
Post-Bid
Phoenix, AZ

Chilled Water Pump
Results
Tempe, AZ 85283

Well Maintenance
Term Contract
Post-Bid
AZ

Water Production Well Drilling Services
Term Contract
Results
Less than $7,000,000 est. value
Tucson, AZ 85701

Reported 11/19/2021 12:00 AM
Project Title

Navajo Nation Western Navajo Pipeline Phase 1 - Bodaway-Gap Well Project

Physical Address View project details and contacts
City, State (County) Fort Defiance, AZ 86504   (Apache County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Bodaway-Gap Well 3 (Navajo Nation Bid Number 20-10-2371LE) which includes: • Bodaway-Gap Well No. 3: Drilling/Construction of the new Well No. 3 drinking water supply well (approximately 1,000 feet deep, 160 gpm) in the Bodaway-Gap Community Drinking Water System.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents