Similar Projects
Reported | 02/14/2020 12:00 AM |
Project Title | Repainting of Interior Walls, Door Frames and Refinishing Two Corridor Doors |
Physical Address | View project details and contacts |
City, State (County) | Enterprise, AL (Coffee County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work for Previously Painted Concrete, Sheetrock and Paneling Walls: 1. Walls should be cleaned with Corotech V600-00 Grease and Oil Emulsifier per the label directions to remove any grease, oil or other contaminants. 2. Allow to dry. 3. Sand with 220 grit sandpaper to create paintable surface profile. 4. Remove any dust and/or peeling paint. 5. Apply one coat lnsl-x Aqua lock primer at 4.0- 5.3 wet mils to 1.6- 2.2 dry mils. 6. Apply 2 coats Benjamin Moore Scuff-X 485 Eggshell coating per label instructions. Color to be determined by the owner (ESCC). 7. Follow all product manufacturer's directions, specifications and recommendations. 8. Thoroughly clean all work areas to include sweeping, mopping and wiping down all surfaces (walls, window sills, fur11ishing, etc.). Clean up should be performed each day prior to exiting the site. Scope of Work for Previously Painted Metal Door Frames: 1. Doors, door frames and commode partitions should be cleaned with Corotech V600-00 Grease and Oil Emulsifier per the label directions to remove any grease, oil or other contaminants. 2. Allow to dry. 3. Sand with 220 grit sandpaper to create paintable surface profile. 4. Remove any dust, dirt or other contaminants. 5. Apply one coat lnsl-x Aqua lock primer at 4.0- 5.3 wet mils to 1.6 - 2.2 dry mils. 6. Apply 2 coats of Coronado Rust Scat 31 Line polyurethane gloss coating per label instructions. Color to be determined by owner (ESCC). 7. Follow all product manufacturer's directions, specifications and recommendations. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |