Similar Projects
Full Service Maintenance Contract for Carrier Equipment
Term Contract
Bidding
College Park, MD 20742

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Glassmanor Elementary School - Building Envelope and Central HVAC Conversion
Results
$3,000,000 est. value
Upper Marlboro, MD 20745

RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

Croom High School HVAC Modernization
Results
Less than $1,700,000 est. value
Cheltenham, MD 20623

HVAC Preventative Maintenance and Service
Post-Bid

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

BARC MCquay Range #2 Chiller
Post-Bid
Beltsville, MD 20705

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

Dust Collection Unit
Results
MD 20762

Last Updated 05/26/2020 10:01 AM
Project Title

J.E. Proctor Building Chiller Replacement

Physical Address View project details and contacts
City, State (County) Bowie, MD 20715   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is for the replacement of two existing water-cooled chillers in the penthouse of the building with two new (300 ton) air-cooled chillers. The new chillers will be installed on new steel dunnage on the roof parapet. The work will include demolition of existing piping, electrical etc. to accommodate the tie in of new piping and electrical work for the new chillers. It will also include work in the third floor ceiling to install reinforcement of existing steel members

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 05 - Metals, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Grating Stairs, Metal Railings, Pipe and Tube Railings, Metal Gratings, Bar Gratings.
Division 07 - Thermal and Moisture Protection, Wall Panels, Built-Up Bituminous Roofing, Sheet Metal Flashing and Trim, Applied Fireproofing, Joint Sealants.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents