Similar Projects
Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Wynwood Apartments
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

3900 Alton
New Construction - 178,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL 33140

Century Towne Place
New Construction - 47,000 SF
Design
$10,000,000 CJ est. value
Doral, FL

Snipes
Renovation - 6,918 SF
Bidding
Miami, FL 33172

IKEA
Renovation
Bidding
Miami, FL 33172

Spring Oaks Greenhouses
Renovation - 3,339 SF
Sub-Bidding
North Miami Beach, FL 33160

Development of Property at Vizcaya Station
Post-Bid
Miami, FL 331281

Foot Locker #7757
Renovation - 5,032 SF
Post-Bid
$200,000 est. value
Miami, FL 33127

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Target
New Construction - 77,471 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Miami, FL 33010

Southwest 127th Avenue Mixed-Use Development
New Construction - 45,302 SF
Conception
Miami, FL 33177

MCID-2
New Construction, Renovation, Build-Out - 1,141,800 SF
Design
$10,000,000 est. value
Miami, FL

Sam's Club #6217-605 - Capxhvac-1
Renovation
Post-Bid
Miami, FL 33126

Reported 12/10/2021 11:12 AM
Project Title

DD's Discount

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Retail, 1 Story Above Grade, Approximately 22,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents