Similar Projects
Clarksburg - Philippi Rd
Infrastructure
Design
$566,000 CJ est. value
Philippi, WV 26416

Clarksburg - Philippi Rd
Infrastructure
Design
$566,000 CJ est. value
Philippi, WV 26416

Belington-Tenmile Rd
Infrastructure
Bidding
$500,000 CJ est. value
Philippi, WV 26416

Belington-Tenmile Rd
Infrastructure
Bidding
$500,000 CJ est. value
Philippi, WV 26416

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 RPM
Results
WV

Resurfacing
Infrastructure
Results
WV

Contract #1 - Water System Improvements
Infrastructure
Bidding
$7,559,000 CJ est. value
Philippi, WV 26416

Repair Products for Bridges and Roads 6621C024
Infrastructure
Post-Bid

Alum Cave Trail
Infrastructure
Results
WV

Contract #2 - Water Meter Replacement
Infrastructure
Bidding
$572,000 CJ est. value
Philippi, WV 26416

Junior-Belington Road
Infrastructure
Results
WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Region 2 AML Northern Maintenance
Infrastructure
Results

Last Updated 10/21/2022 03:05 AM
Project Title

WV 72 I/C-parsons (AC Payback)(Go Bond)

Physical Address View project details and contacts
City, State (County) Belington, WV 26250   (Barbour County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0484323 Type of Work : Gr, Dr, Pave As of October 21, 2022, the project is in Final Planning status. The funding obligation date for the construction is October 28, 2022. WVDOT - WV 72 I/C-parsons (AC Payback)(Go Bond) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents