Similar Projects
Vine Street Bridge #2 PM
Infrastructure, Renovation
Conception
$2,875,000 CJ est. value
Hummelstown, PA 17036

Highland St Connectivity
Infrastructure
Conception
$403,084 CJ est. value
Swatara, PA 17111

Phase 4 Pennvest SW Pro-FI
Infrastructure
Design
$7,114,785 CJ est. value
Harrisburg, PA 17102

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$5,713,010 CJ est. value
Brecknock Township, PA 19540

Susquehanna Union Green Shell Office Building
New Construction, Infrastructure - 15,314 SF
Bidding
$1,600,000 CJ est. value
Susquehanna Township, PA 17110

2023 Sewer System Improvements Project - Excavation
Infrastructure
Bidding
$300,000 CJ est. value
Harrisburg, PA 17102

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

Bureau of Elections (BOE) Building Site Improvements
Post-Bid
$250,000 to $300,000 est. value
Harrisburg, PA 17111

Wiconisco Water Storage Tank - Site Prep
Infrastructure
Results
$95,000 est. value
Lykens, PA

Wildwood Park Boardwalk Improvements
Infrastructure
Results
$729,000 CJ est. value
Harrisburg, PA 17110

Mister Car Wash
New Construction, Infrastructure
Pending Verification
$1,300,000 CJ est. value
Harrisburg, PA 17112

Thermo Fisher Scientific Expansion
New Construction, Renovation, Infrastructure - 47,000 SF
Pending Verification
$40,000,000 CJ est. value
Millersburg, PA 17061

Church Of God Central Publishing House
Infrastructure, Renovation
Design
$2,300,000 CJ est. value
Harrisburg, PA 17103

2023 Sewer System Improvements Project - Trenchless
Infrastructure
Bidding
$200,000 CJ est. value
Harrisburg, PA 17102

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Last Updated 09/09/2022 12:01 PM
Project Title

Pennsylvania Joint Laboratory Facility

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17102   (Dauphin County)
Category(s) Green Building, Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, LEED Certified, Site Development
Contracting Method Competitive Bids
Project Status Seeking Site Plan Approvals, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $212,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 2, 2022, a designer has been selected. No timeline has been established for the bidding and construction. *The previous solicitation is listed below for reference The scope of work includes, but is not limited to, the Commonwealth of Pennsylvania is developing a project for a Joint Laboratory Facility to be located in the Harrisburg, PA area. It is proposed that five Agencies would be physically unified within the building with shared common facilities. The Joint Laboratory will present a unified public image; however, each Department will need to maintain its own individual identity and organization. ESTIMATED CONSTRUCTION COST: $212,000,000.00. The Goals for SDB participation: 14% The Goals for VBE participation: 3% The following information will need to be provided: detailed resumes for key design and management personnel with references; key personnel must have experience leading or participating in Lean projects; the firm's approach to the project, including descriptions of tasks and scope of services, and an explanation of how the approach provides value to the Commonwealth; a detailed description from the firm's portfolio of a project using Lean tools and methods that illustrates the firm's ability to translate design intentions into a solution that meets the client's needs and expectations; an organizational chart and detailed work plan, identifying key personnel roles and percent of time assigned to the project; an explanation of how the firm assures high quality bidding documents; examples of relevant projects completed by the lead design professional and key personnel, with contact information for references for these projects; an assessment of key project issues and risks to the project; identification of special investigations, studies or testing that may be required; a description of the firm's understanding of the LEAN processes described in the Program Development Study and how the firm has used these processes successfully on other projects, including references for the projects; firm's understanding of lab planning and design principles; firm's experience with Biosafety levels and biosecurity facilities; firm's understanding of requirements of lab facilities as it relates to accreditations such as (CLIA), Forensic Laboratory Testing Accreditation Requirements, etc.; consultants team experience with mechanical engineering solutions for laboratory spaces; firms to have in house or consultant as part of team for lab design for each using agencies; firm's experience with applying for LEED level certification for lab facilities; and a non-binding fee proposal.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents