Similar Projects
2022 Bond - Proposition A - Seguin Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$135,000,000 CJ est. value
Seguin, TX 78155

Cordova Rd
Infrastructure
Conception
$22,256,128 CJ est. value
Seguin, TX 78155

Dutch Bros Coffee / Seguin
New Construction, Infrastructure
Design
$650,000 CJ est. value
Seguin, TX 78155

Loop 1604 and I-10 Interchange - Texas Department of Transportation
Infrastructure
Design
$1,360,000,000 CJ est. value
Schertz, TX 78154

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

IH0010 - Mowing Highway Right of Way
Term Contract
Sub-Bidding
$748,670 CJ est. value
Seguin, TX 78155

IH0010 - Hot Mix
Term Contract
Sub-Bidding
$341,600 CJ est. value
Seguin, TX 78155

Clearwater Creek Phase 1A Single-Family Residential Development - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
Marion, TX 78124

Haeckerville Road Water Main Extension
Infrastructure
Post-Bid
Cibolo, TX 78108

SSLGC - Roads and Well Piping (Contract 2)
Results
Less than $5,000,000 est. value
Seguin, TX

Sebastoopol House Re-Grading and Paving Alterations
Results
$44,750 est. value
Seguin, TX

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

Last Updated 12/06/2022 08:56 PM
Project Title

Santa Clara Loop and Wetz Road Drainage and Road Improvements

Physical Address View project details and contacts
City, State (County) Santa Clara, TX 78124   (Guadalupe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $974,250 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Roadway and drainage improvements on Santa Clara Loop and Wetz Road to include reworking base courses (lime treatment), 2-course chip seal, ROW drainage improvements, concrete flat work. Bids are requested for the following Contract: SANTA CLARA LOOP AND WETZ ROAD DRAINAGE AND ROAD IMPROVEMENTS The Project has an expected duration of 120 days. There is no prebid conference for this project. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, proce- dures, and con- tract award, refer to the Instructions to Bidders that are included in the Bidding Doc- uments.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents