Similar Projects
City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

Bloomfield Township 2022 Safety Path Program
Infrastructure
Bidding
$200,000 est. value
Bloomfield Township, MI

2022 Concrete Sidewalk Repair Program
Infrastructure
Bidding
$350,000 est. value
Birmingham, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

Construction of a Roundabout including, Concrete Curb, Gutter and Ramps, Guardrail on Taft Road
Infrastructure
Bidding
$3,922,000 est. value
Novi, MI 48374

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Main Entrance Improvement Project
Results
Berkley, MI 48072

West Bloomfield Towns Hall - Civic Center Drive Parking Lot Repairs
Infrastructure
Bidding
$200,000 est. value
West Bloomfield, MI 48323

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

Gallagher Road Trail
Results
Rochester, MI 48306

Hot Mix Asphalt and Concrete Paving, Add Left Turn Lane, Curb, Gutter and Sidewalk, Pavement Repairs and Pavement Markings on 10 Mile Road
Infrastructure
Bidding
$8,026,000 est. value
Novi, MI 48375

2021 Parking Lot
Post-Bid
Madison Heights, MI

Last Updated 06/15/2022 11:30 AM
Project Title

2025 Road Improvements-- CAP2510 - City of Royal Oak

Physical Address View project details and contacts
City, State (County) Royal Oak, MI 48067   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water main upgrades on: Woodward, Buckingham to Normandy; Woodward, north of Starr; Chester, Hillside to Dukeshire, Dukeshire - Chester to Normandy; Sheridan/Arden Place (plus rain gardens), Yorba Linda (Dukeshire to Woodward) Also includes road millage improvements on these roads including full reconstruct of Yorba Linda. This project is in included in the City of Royal Oak FY 2022-2027 Capital Improvement Plan (CIP). As of June 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Renovation.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents