Similar Projects
Springwells Water Treatment Plant 1958 Flocculator Replacement
Renovation
Bidding
$105,000 CJ est. value
Dearborn, MI 48126

Alley Reconstruction and Sanitary Sewer Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Richmond, MI 48062

Plumbing Maintenance, Repair and On-Call Services
Term Contract
Sub-Bidding
Flint, MI 48502

Water Meter and Valve Replacement
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Grand Haven, MI 49417

Residential Plumbing Contractor
Post-Bid
Detroit, MI

Police Department Sanitary Plumbing Analysis and Repairs
Alteration
Post-Bid
Madison Heights, MI 48071

E-One Grinder Pumps
Results
Oakland, MI

Plumbing Verification Services
Results
Benton Harbor, MI

Plumbing Repairs
Term Contract
Sub-Bidding
Detroit, MI 48226

Plumber 2022-2024
Term Contract
Post-Bid
Benton Harbor, MI

Plumbing Service
Alteration
Results
River Rouge, MI 48218

Blueberry Tank Valve Replacement
Alteration
Post-Bid
South Haven, MI

2021 Plumbing Replacement Project
Alteration
Results
Saint Joseph, MI 49085

Drinking Fountain
Alteration
Post-Bid
Bangor, MI

FMO Plumbing and Heating Services
Alteration
Results
Waterford, MI

Last Updated 01/26/2023 09:01 AM
Project Title

CSO 015 South Project

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $41,186,875 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 26, 2023, the project was awarded to Leavitt & Starck for $41,186,874.78. Bonding Requirements - Bid Bond 5 % Questions are submitted online No 1. 25% of total project hours performed by City residents 2. 15% of subcontracted work performed by local Subcontractors 3. 19.03% workforce minority 4. 17.51% workforce female Location: Area bounded by Lapeer Street on the northside; Sycamore Street on the eastside; Ottawa Street on the southside; and Verlinden Street on the westside. Combined sewer separation construction within the City of Lansing's CSO Subarea 015S. The project involves new sanitary sewer and water main installation, along with road reconstruction. The project consists of the following: Installation of approximately 19,000 feet of 8-inch sanitary sewer Installation of approximately 1,700 feet of 10-inch sanitary sewer Installation of approximately 600 feet of 12-inch sanitary sewer Installation of approximately 800 feet of 15-inch sanitary sewer Installation of approximately 1,600 feet of 18-inch sanitary sewer Installation of approximately 2,400 feet of 21-inch sanitary sewer Installation of approximately 7,000 feet of 8-inch through 72-inch storm sewer Installation of 130 sanitary manholes Installation of 72 drainage structures Installation of 144 catch basins CIPP Lining of approximately 9,000 feet of sewer Installation of approximately 28,000 feet of 8-inch water main Installation of approximately 2,000 feet of 16-inch water main Installation of approximately 52,000 feet of curb and gutter Installation of approximately 64,000 square feet of sidewalk Installation of approximately 23,000 tons of HMA Final completion- June 12, 2026.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents