Similar Projects
Blair Street, South - 11128 - City of Madison
Infrastructure
Conception
$1,627,000 CJ est. value
Madison, WI 53703

Senior Center Building Improvements - 12434 - City of Madison
Renovation, Infrastructure
Conception
$330,000 CJ est. value
Madison, WI 53703

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Monona Drive Mixed-Use Development
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, WI 53716

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53711

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Phased Modernization of the USGS National Wildlife Health Center in Madison - US Geological Survey (USGS) - Western Ecological Research Center
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Madison, WI 53711

Madison Fire Station 6 Remodel
Addition, Demolition, Build-out, Infrastructure
Post-Bid
$5,435,131 CJ est. value
Madison, WI 53713

Pope Farm Ravine Restoration
Infrastructure
Results
Middleton, WI

MSN Clearing Runway 18-36 Approaches
Infrastructure
Results
Madison, WI 53704

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

University Avenue Duplexes
Demolition, New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Middleton, WI 53562

Park Street, South / Olin To Railroad - 11133 - City of Madison
Infrastructure
Conception
$458,000 CJ est. value
Madison, WI 53715

Last Updated 04/10/2023 05:04 AM
Project Title

Unit Well 12 Conversion to a Two Zone Well - 10452 - City of Madison

Physical Address View project details and contacts
City, State (County) Madison, WI 53707   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2027
Bids Due View project details and contacts
Estimated Value $4,058,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for rebuilding and expanding Well #12 located on South Whitney Way. The goal of the project is to provide water supply capacity to five existing pressure zones, which represents the majority of the City's west side. The system flexibility provided by this project will improve service reliability and maximize water supply. Funding in 2023 is for design and funding in 2024 is for construction. This project is included city's FY 2022-2027 Capital Improvement Program. As of May 27, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents