Similar Projects
Last Updated | 06/22/2021 02:46 PM |
Project Title | East Area Water Quality Control Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Atlanta, GA (Fulton County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | East Area Water Quality Control Facility Improvements should include modifications to sedimentation basin including new sludge pumps, and new instrumentation; improvements to sludge handling system, including sludge holding tank and solids processing pump station rehabilitation; rehabilitation to the existing solids processing pump station; demolish and install new sludge dewatering building with belt filter presses and all associated equipment; install sampling equipment and instrumentation upstream and downstream of the sedimentation basins to monitor dissolved oxygen, pH and total chlorine residual; repair the chemical system at the EA WQCF and the Custer Avenue CSCF; tunnel outfall flume repair work, including demolition of a portion of the existing structure, civil work, concrete work, and appurtenances, as shown and or specified in the contract documents; repair sedimentation basin leak repair; and repair Custer Avenue Tunnel Gate. |
||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |