Similar Projects
Wastewater Treatment Plant
New Construction
Design
Buena Vista, GA

Shoal Creek Filter Plant Filter Rehabilitation Project
New Construction
Bidding
Less than $6,000,000 est. value
Buford, GA 30518

Thermal Dryer Equipment Selection
Post-Bid
Athens, GA

Water Treatment Plant #1 Aerator Replacement
Post-Bid
Kingsland, GA 31548

Ridgewood Water Production Facility
Results
Brunswick, GA 31520

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Riverside Drive WTP High Service Pump No. 7
Post-Bid
Gainesville, GA 30501

Install Infrastructure for Pilot Study
Results
Cumming, GA 30040

Water Treatment Services (Annual Contract)
Term Contract
Post-Bid
Savannah, GA 31401

Raw Water Intake 1 - Grit Removal System Repair lamar Ham Water Treatment Plant Milledgeville
Results
Less than $9,549 est. value
Milledgeville, GA 31061

Loopers WTP Dewatering Facilities Upgrade
Post-Bid
Dalton, GA

Towaliga WTP Filter Rehabilitation
Results
Locust Grove, GA 30248

2019 Water Pollution Control Facilities Rehabilitation Academy Creek BGJWSC
Post-Bid
Brunswick, GA 31520

Fowler Water Reclamation Facility Renovation
Results
Cumming, GA 30040

Industrial Park Division 1 - Water Treatment Plant
Post-Bid
Warner Robins, GA

Last Updated 06/22/2021 02:46 PM
Project Title

East Area Water Quality Control Facility Improvements

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

East Area Water Quality Control Facility Improvements should include modifications to sedimentation basin including new sludge pumps, and new instrumentation; improvements to sludge handling system, including sludge holding tank and solids processing pump station rehabilitation; rehabilitation to the existing solids processing pump station; demolish and install new sludge dewatering building with belt filter presses and all associated equipment; install sampling equipment and instrumentation upstream and downstream of the sedimentation basins to monitor dissolved oxygen, pH and total chlorine residual; repair the chemical system at the EA WQCF and the Custer Avenue CSCF; tunnel outfall flume repair work, including demolition of a portion of the existing structure, civil work, concrete work, and appurtenances, as shown and or specified in the contract documents; repair sedimentation basin leak repair; and repair Custer Avenue Tunnel Gate.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents