Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$574,920 CJ est. value
Mercer, PA 16137

Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$574,920 CJ est. value
Mercer, PA 16137

State Street Pedestrian Improvements
Infrastructure
Design
$769,960 CJ est. value
Hermitage, PA 16148

State Street Pedestrian Improvements
Infrastructure
Design
$769,960 CJ est. value
Hermitage, PA 16148

Digester Rehabilitation Project - Contract HMA 2022 - 01, Contract HMA 2022 - 02 and Contract HMA 2022 - 03
Renovation, Infrastructure
Bidding
$2,262,000 CJ est. value
Hermitage, PA 16148

Digester Rehabilitation Project - Contract HMA 2022 - 01, Contract HMA 2022 - 02 and Contract HMA 2022 - 03
Renovation, Infrastructure
Bidding
$2,262,000 CJ est. value
Hermitage, PA 16148

Asphalt Surface Treatment
Post-Bid
Mercer, PA

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

South Darby Road Stormwater and Roadway Improvements Project
Results
Hermitage, PA 16148

2020 Neighborhood Investment Program
Results
Hermitage, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Parking Lot Resurfacing at Primary Health Sites
Infrastructure
Bidding
$2,000,000 CJ est. value
Greenville, PA 16125

Last Updated 09/23/2022 11:44 AM
Project Title

Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Greenville, PA 16125   (Mercer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,179,085 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes Waterline Replacement Projects located on West Main Street, Quarry Street, Walnut Street, Clarksville Street, Coal Hill Road, Kilbourne Road, South Water Street, Clinton-Race Intersection, Leech Road, Long Alley, 4th Avenue, and 6th Avenue) - Including but not limited to the installation of water main, tapping sleeve installation, fire hydrant installation and removal, service line replacements, gate valve installation and abandonment, abandoning existing water mains, erosion and sediment controls, curb restoration, and surface restoration in and along Borough and State roadways. For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012.Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Owner hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date. Requests for clarification are due Tuesday, July 26, 2022 2:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)].

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents