Similar Projects
The Armed Forces Retirement Home Campus Redevelopment
New Construction, Infrastructure - 4,553,000 SF
Conception
$60,000,000 CJ est. value
Washington, DC 20011

RFQ - Office of Construction and Facilities Management (CFM), Program Management (PM) Support services
Renovation
Design
Washington, DC 20001

RFQ Contractor - VA Medical Center (VAMC) Mechanical Systems Ongoing Maintenance And Repairs BPA
Term Contract
Bidding
Washington, DC 20422

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

P-5001 Joint Air Defense Operations Phase 2
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Washington, DC 20036

Fort Greble Urban Nature Center
New Construction - 2,000 SF
Results
$2,100,000 est. value
Washington, DC 20032

Kennedy Center Memorial Interpretation Atrium Renovation & JFK Exhibit
Renovation - 8,093 SF
Construction
Washington, DC 20566

Nightclub, Restaurant and Penthouse
Renovation, Addition - 181,450 SF
Pending Verification
Washington, DC 20005

Dance Loft - Mixed-Use with Theatre and Studio
New Construction - 115,434 SF
Pending Verification
$10,000,000 CJ est. value
Washington, DC

NMIC-1 Refurbish Room 3A104, 2C120, and 2B100
Renovation
Post-Bid
Washington, DC 20395

Caption by Hyatt - Chinatown, Washington, D.C.
New Construction, Infrastructure - 75,521 SF
Pending Verification
$20,550,000 CJ est. value
Washington, DC 20036

Atrium Renovation and JFK Exhibit Installation
Renovation
Post-Bid
Washington, DC 20566

Warner Bros. Theater Dolby Audio Visual Upgrades
Renovation
Pending Verification
$200,000 CJ est. value
Washington, DC 20560

Multiple Award Construction Task Order Contract
New Construction, Renovation, Demolition
Post-Bid
Washington, DC - Baltimore, Perry Point, MD - Beckley, Clarksburg, Huntington, WV 21201

Good Hope Road Mixed-Use Development
New Construction, Infrastructure - 8,000 SF
Pending Verification
$2,500,000 CJ est. value
Washington, DC 20020

Last Updated 10/08/2022 10:03 AM
Project Title

Partial Building Renovation for Building 59 National Defense University, Fort McNair, Washington, D.C.

Physical Address View project details and contacts
City, State (County) Washington, DC 20319   (District of Columbia County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Convention/Exhibit Center, Military Facility, Theaters/Auditoriums
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $40,616,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 26, 2022 Contract Award Number: W912DR22C0051 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: R6CPWWDD4AM1 Contractor Awarded Name: GRUNLEY CONSTRUCTION CO., INC. Contractor Awarded Address: Rockville, MD 20850-3390 USA Base and All Options Value (Total Contract Value): $40616000.00 The project is to provide HVAC and renovation services for Eisenhower Hall (Building 59), which is located on the Fort McNair Military Base in Washington, D.C., Building 59 functions as an educational facility in support of the National Defense University. Eisenhower Hall was built in 1960 and is over 60 years old. Existing Building background: Building 59 is a four (4) story building of approximately 130,000 square feet (SF) with a small mechanical basement and crawl space as well as a mechanical penthouse. Currently Building 59 houses 400-450 people and the facility systems run 24/7. The facility houses numerous classrooms, study carrels, conference rooms, offices, and two large auditoriums as well as other support functions. Building 59 is within a historic zone and exterior modifications must be reviewed and approved by State Historic Preservation Office (SHPO). Major upgrades were done in 1996. which includes: Upgrades major to mechanical systems and other systems. Original windows were maintained but new storm windows that include a film to provide a level of blast protection were incorporated behind the original windows towards the inside. Blinds were placed between these two window systems without any provision for venting the trapped air. Solar panels were installed on the roof. The work includes partial building renovation with hazardous material, civil, architectural, building envelope repair, structural, plumbing, mechanical/HVAC upgrades, electrical, telecommunication and audio/visual work, and incidental related work, to include but not limited to a Sensitive Compartmented Information Facility (SCIF). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. CONTRACT NO.: W912DR-20-D-0001 W912DR-20-F-0470

Details

4 Stories Above Grade, 130,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Fixed Audience Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents