Similar Projects
Last Updated | 09/30/2021 03:27 PM |
Project Title | CRAC Units Midland, TX |
Physical Address | View project details and contacts |
City, State (County) | Midland, TX 79706 (Midland County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor and materials to replace existing CRAC units with a new system serving site Equipment, Electric, and Communications Rooms. Based upon heating & cooling loads, the MAF WFO will require a 10-ton Liebert Unit or equivalent system. Equivalency will be based upon system performance, reliability, energy efficiency, footprint, and warranty. The System must continually maintain rooms between 65-74 degrees Fahrenheit and 45-55% Relative Humidity. All new systems must have N+1 redundancy to ensure system availability in the event of component failure. Components (N) must have at least one independent backup component (+1). New systems must automatically switch lead system to lag each month to balance operating hours between primary and standby system. Enable monitoring and control of new systems through integration with existing Building Automation System. Refer to as-built mechanical drawings for original installation (Copies available upon request). Heating and cooling must be maintained in the Equipment Room 24 hours x 7 days per week without interruption |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |