Similar Projects
Removal and Replacement of HVAC systems
Post-Bid
Glen Rose, TX 76043

HVAC Filters
Post-Bid
Live Oak, TX

Uvalde HVAC Replacement and Repair Work
Results
$42,000 to $47,000 est. value
Uvalde, TX 871023118

Installation of Vehicle Exhaust Removal Systems at Fire Stations 1, 2, and 4
Results
Less than $168,700 est. value
College Station, TX 77845

Stephen F. Austin Elementary 2021 HVAC Central Plant Upgrades
Post-Bid
Gregory, TX 78359

HVAC and Generator Replacement at the Austin State Supported Living Center
Results
$157,000 est. value
Austin, TX 78703

HVAC Services Del Valle ISD
Infrastructure
Post-Bid
Del Valle, TX

Purchase and Installation of A 90-Ton Scroll Chiller at Austin State Hospital
Results
Austin, TX 78751

Furnishing, Delivering and Installing Air Purification/Cleaning System for Learning Spaces for K-6
Term Contract
Post-Bid
San Antonio, TX

HVAC Replacement/Upgrade
Term Contract
Results
$276,476 est. value
Plano, TX 75093

Annual Contract for HVAC Chiller Maintenance, Repair, and Parts Replacement
Term Contract
Post-Bid
Fort Worth, TX

Annual Contract for Ice Sheet Chiller Maintenance at the Alamodome
Term Contract
Results
San Antonio, TX 78283

Outside Air System Replacement
Alteration
Post-Bid
San Antonio, TX

HVAC Equipment Replacement for Precinct 2 Maintenance Facility
Results
$50,529 est. value
Kennedale, TX 76060

HVAC Improvement and Replacement Misc. Campuses
Alteration
Post-Bid
$1,000,000 est. value
Pittsburg, TX

Last Updated 09/30/2021 03:27 PM
Project Title

CRAC Units Midland, TX

Physical Address View project details and contacts
City, State (County) Midland, TX 79706   (Midland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to replace existing CRAC units with a new system serving site Equipment, Electric, and Communications Rooms. Based upon heating & cooling loads, the MAF WFO will require a 10-ton Liebert Unit or equivalent system. Equivalency will be based upon system performance, reliability, energy efficiency, footprint, and warranty. The System must continually maintain rooms between 65-74 degrees Fahrenheit and 45-55% Relative Humidity. All new systems must have N+1 redundancy to ensure system availability in the event of component failure. Components (N) must have at least one independent backup component (+1). New systems must automatically switch lead system to lag each month to balance operating hours between primary and standby system. Enable monitoring and control of new systems through integration with existing Building Automation System. Refer to as-built mechanical drawings for original installation (Copies available upon request). Heating and cooling must be maintained in the Equipment Room 24 hours x 7 days per week without interruption

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents