Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

HVAC Filter Service
Alteration
Bidding
Fayetteville, NC 28306

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Remove and Replace (2) HVAC Systems
Post-Bid
Elizabeth City, NC 27909

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Furnish, Deliver and Install a Trane at CGAM 60-Tom Replacement Chiller for the Bullock Building at Lenoir Community College
Post-Bid
Kinston, NC 28504

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

J045--Resolicitation HVAC Preventive Maintenance
Post-Bid
Salem, NC 27155

EMD Facility HVAC Upgrades
Results
Wilmington, NC

HVAC Projects
Post-Bid
Carthage, NC 28327

Hendersonville Elementary School HVAC Controls Replacement
Results
Hendersonville, NC 28791

Install an Underground Compressed Air Piping System
Post-Bid
Elizabeth City, NC

Last Updated 09/30/2021 11:00 AM
Project Title

West Buncombe Elementary School Replace (2) Separated Combustion Makeup Air Handlers

Physical Address View project details and contacts
City, State (County) Asheville, NC 28806   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $37,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of furnishing all labor, materials, equipment, permits and servicing, incidental and implied, for the completion of a working system as designed per the attached specifications. 1. Remove existing outdoor air handlers. 2. New line sets to be included in the bid. 3. Install new replacement units as specified. 4. All additional ductwork shall be properly tied in and insulated. 5. All low voltage wiring shall be in conduit. 6. Factory start-up, and adjustment test report shall be part of this contract. Three digital copies of the completed factory start-up sheet, installation, operation, and maintenance manuals shall be delivered to the owner on Thumb drives (USB flash drives) before final payment will be made. 7. All unused equipment, piping, wiring and duct shall be removed. 8. All wiring, accessories, disconnects can be re-used (unless the condition demands replacing). 9. ALC Controls shall be re-connected (Harris ISI, contact: Chuck Still).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents