Similar Projects
Last Updated | 07/25/2023 03:06 PM |
Project Title | 2022 Bituminous Rehabilitation Projects |
Physical Address | View project details and contacts |
City, State (County) | Mora, MN 55051 (Kanabec County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,368,111 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SAP 033-620-011 and 033-630-003 Kroschel Township SAP 033-617-010 and 033-605-022 Grass Lake Township KCP 22-04 Brunswick Township ATP 22-01 Mora MN area. Project bid documents must be downloaded from QuestCDN which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). SAP 033-620-011 - (2.02 mi.) The project is located 25 miles Northeast of Mora MN. The work consists of Bituminous surfacing, Aggregate Shouldering, and Striping, Full Depth Reclamation, and sign installation. among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 30,000 SY Full Depth Reclamation; 1,249 CY Shoulder Base Aggregate (LV), Class 1; 1,429 Gallons Bituminous Material for Tack Coat; 3,364 Tons Type SP 9.5 Wearing Course Mixture (2,C); 3,364 Tons Type SP 9.5 Non-wearing Course Mixture (2,C); 4 Each Mailbox Support; 1 L.S. Traffic Control; 26,830 L.F. 4" traffic marking lines paint, among other things SAP 033-630-003 - (1.20 mi.) The project is located 25 miles Northeast of Mora MN. The work consists of Bituminous surfacing, Aggregate Shouldering, and Striping, Full Depth Reclamation, and sign installation. among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 16,996 SY Full Depth Reclamation; 816 CY Shoulder Base Aggregate (LV), Class 1; 843 Gallons Bituminous Material for Tack Coat; 1,985 Tons Type SP 9.5 Wearing Course Mixture (2,C); 1,985 Tons Type SP 9.5 Non-wearing Course Mixture (2,C); 1 L.S. Traffic Control; 17,073 L.F. 4" traffic marking lines paint, among other things SAP 033-617-010 - (3.40 mi.) The project is located in Grasston MN to 3 mile west. AND, SAP 033-605-022 - (0.47 mi.) is located 1/2 mile west of Grasston MN - The combined work consists of Bituminous Overlay, Bituminous Surfacing, Full Depth Reclamation, Milling Bituminous, Aggregate Shouldering, signing, and Striping, among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 30,092 SY Full Depth Reclamation; 65,813 SY Mill Bituminous Surface (2") 1,028 CY Shoulder Base Aggregate (LV), Class 1; 4,031 Gallons Bituminous Material for Tack Coat; 4,259 Tons Type SP 9.5 Wearing Course Mixture (2, B); 3,388 Tons Type SP 9.5 Wearing Course Mixture (2, C); 3,388 Tons Type SP 12.5 Non-Wearing Course Mixture (2, C); 27 Each Mailbox Support; 1 L.S. Traffic Control; 71,716 L.F. 4" traffic marking lines paint, 504 SF Sign panels Type C and D; among other things KCP 22-04 - 5.87 miles of Tight blade leveling and Bituminous overlay with Aggregate shouldering, on County Road 48, 5 miles south of Ogilvie Mn. The major quantities of work are: 1,320 CY of Shoulder Base Aggregate Class 1; 8,975 Tons Type 9.5 Wearing Course Bituminous Mixture (2, B); 1,089 Tons Type 4.5 Non-wearing course Bituminous Mixture (2, B) (3/4" lift of paver laid tight blade leveling); 45 Each Mailbox Support; 121,719 LF of 4" Solid line striping; 1 L.S. Traffic Control, 504 SF Sign panels Type C and D; among other things Arthur Township Project 22-01 - 0.52 miles of Bituminous surfacing over aggregate base, 1 mile south of Mora MN. The major quantity is 1,350 Tons of Type 9.5 Wearing Course Bituminous mixture (2,C) AND 0.51 miles of Bituminous overlay, 2.6 mile southwest of Mora MN. The major quantity is 828 Tons of Type 9.5 Wearing Course Bituminous mixture (2,B) Working Days will begin July 11, 2022. Construction operations shall not commence prior to Contract Approval. COMPLETION DATE: 40 Working Days |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |