Similar Projects
Generator System Maintenance and Repair Services
Alteration
Bidding
Atlanta, College Park, Conley, Ellenwood, Fayetteville, Forest Park, Hampton, Jonesboro, Morrow, Rex, Riverdale, GA 30236

Bennett A. Brown Commerce Building - Replace Building Switchgear System
Alteration
Bidding
$140,500 est. value
Atlanta, GA 30303

Alternate Aviation Ground Power Unit (AGPU) Generator
Post-Bid
Atlanta, GA

Procurement of Inspections and Maintenance of Generator Services
Post-Bid
Atlanta, GA 30324

Midtown Atlanta Regional Activity Center - Pedestrian Mobility
Results
Atlanta, GA 30303

North Airfield Ground Lighting Cable Replacement
Results
Atlanta, GA 30303

Design Build Services for Standby Generators at Remote Pumping Stations
Alteration
Bidding
Atlanta, GA

Annual Contract for Electrical Testing and Inspection Services
Term Contract
Post-Bid
Atlanta, GA

Skid Mounted Proportioner System and Genset Compressor Combo Package
Results
Less than $153,040 est. value
GA

Traction Power Substation Replacement Program - Wave 1
Alteration
Bidding
Atlanta, GA

On-Call Electrical Services
Term Contract
Post-Bid
Alpharetta, Milton, Roswell, GA 30004

Power Distribution Material
Results
College Park, GA 30337

Burdett Gym CDBG Renovations
Alteration
Bidding
Atlanta, South Fulton, GA 30349

Hanger Fans
Term Contract
Post-Bid

Underground/Overhead Electrical Distribution and Emergencies Contract
Results
Less than $500,000 est. value
East Point, GA 30344

Last Updated 02/03/2022 12:26 AM
Project Title

Big Creek Water Reclamation Facility Standby Generator System

Physical Address View project details and contacts
City, State (County) Roswell, GA 30075   (Fulton County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Standby generators are required as part of the project in order to provide power to all components of the facility during peak flow conditions. This project includes a standby generator system rated for 12,470V and the new main switchgear, shown in Figures 3, 4, and 5 of Exhibit 2 of the Solicitation Document.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents