Similar Projects
Construction Services for Jetty and Wing Wall Repairs In Kennebunk and Kennebunkport, Maine
Design
$1,000,000 to $5,000,000 est. value
Kennebunk, Kennebunkport, ME

Supply and Delivery of Precast Concrete Box Culvert
Bidding
Less than $1,354,000 est. value
Brewer, Eddington, ME

Construction of a Retaining Wall
Bidding
Richmond, ME

Maintenance Dredging Of The Federal Navigation Project/Lower Kennebec River, Maine
Post-Bid
$1,000,000 to $5,000,000 est. value
Bath, Phippsburg, ME

Bayside Seawall Improvements
Post-Bid
Northport, ME 04849

Senott Road Culvert Replacement
Results
Whitefield, ME

Large Culvert Replacement
Results
Less than $460,000 est. value
Danforth, ME 04424

Instream Culvert Replacements
Bidding
China, Vassalboro, ME

Culvert Pipe
Post-Bid
Portland, ME

Long Creek Main Stem Restoration Project Construction Services
Results
South Portland, ME

Stanley Hill Pavement Reclamation
Bidding
Fryeburg, ME 04037

Ditching and Culvert Work
Post-Bid
Princeton, ME

Adams Street Ditching and Culvert Replacement
Results
Farmingdale, ME

Lantern Lane Culvert Replacement Project
Bidding
Windham, ME 04062

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Reported 11/23/2019 12:00 AM
Project Title

Pleasant Point Revetment, Perry, ME

Physical Address View project details and contacts
City, State (County) Perry, ME 04667   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Services for Pleasant Point Reservation, Emergency Shoreline Protection: The Pleasant Point emergency shoreline protection involves constructing a stone revetment along 1,500 linear feet of shoreline, which endures a 20-foot tidal range, located in front of tribal housing and other tribal facilities on the Pleasant Point Reservation. The original revetment was constructed in the 1980s, but has since deteriorated. This project intends to rebuild the structure entirely by placing new 1-ton stones and associated cobble and gravel filter layers in order to protect the shoreline. The work for this project will also include the modification of up to 5 storm-water drains that will extend through the structure. Staging areas will be located on the Pleasant Point Reservation, which is owned by the Passamaquoddy Tribe (project sponsor). The Passamaquoddy Tribe has adopted Tribal Employment Rights Ordinance (TERO)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents