Similar Projects
Pediatrics Plus Facility
New Construction - 7,900 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bryant, AR

New Band Hall and Football Practice Field Phil Campbell High School
New Construction
Bidding
Phil Campbell, AL 35581

Construction Managers and Architects - Various New Construction and Renovation Projects Districtwide
New Construction, Renovation
Post-Bid
Kirby, AR 71950

Construction Manager for Various Renovation Projects
Renovation
Post-Bid
Yellville, AR

Summer Renovation Projects
Renovation
Results
Salem, AR

Construction Manager for School Facility
Results
Benton, AR

Forrest City High School Industrial Arts Building
New Construction
Construction
Forrest City, AR 72335

Construction Manager for The Fountain Lake School District
New Construction
Post-Bid
Hot Springs, AR

MacArthur School Addition
Renovation, Addition
Results
Jonesboro, AR 72401

New Middle School
New Construction
Post-Bid
Fayetteville, AR

Maintenance Warehouse Project
New Construction
Post-Bid
Pearcy, AR 71964

Career Center Interior Remodel
Renovation
Post-Bid
Gravette, AR 72736

New Multi-Purpose Courts Facility and Remodel of Existing Gym and Classrooms
New Construction
Post-Bid
Harrison, AR 72601

Pottsville School District Band Grandstand
New Construction
Post-Bid
Pottsville, AR 72858

Construction Manager Services
New Construction
Post-Bid
Benton, AR

Reported 09/03/2021 12:00 AM
Project Title

Gravette Old ALE Building Remodel

Physical Address View project details and contacts
City, State (County) Gravette, AR 72736   (Benton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

A brief description of the project is as follows: Interior and exterior renovation of an approximately 2,500 SF existing wood framed building. Upon completion the building will serve as a large flexible classroom with a new kitchen, group instruction area, and private assessment/tutoring rooms. Scope of work includes but is not limited to; site concrete, landscaping, utility work, interior and exterior demolition, masonry, rough carpentry, fiber cement siding, millwork, spray foam and batt insulation, standing seam metal roofing, aluminum storefront, vinyl windows, doors, frames & hardware, drywall and metal stud framing, acoustical tile ceilings, porcelain tile, carpet, specialties, signage, Plumbing, HVAC & Electrical.

Details

1 Middle/Senior High School, 9,500 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 04 - Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents