Similar Projects
Fulton Courtyard - Southwest Tennessee Community College
Infrastructure
Bidding
$300,000 est. value
Memphis, TN 38134

Cherokee National Forest
Infrastructure
Bidding
$2,000,000 to $5,000,000 est. value
Newport, TN 37821

Queener Road Reonstruction
Post-Bid
Loudon, TN 37774

Bridge Replacement at Shady Grove Road over Holly Fork Creek
Post-Bid
Paris, TN 38242

The Resurfacing on I-840 From Leipers Creek Road (L.M. 12.48) to Thompson Station Road (L.M. 18.20)
Results
TN

The Resurfacing on S.R. 93 From Near I-26 (L.M. 6.21) to Near U.S. 11W (S.R. 1) (L.M. 11.33), Including Bridge Deck Repair
Results
TN

Improvement of the Intersection on S.R. 45 (Old Hickory Boulevard) at S.R. 265, Including Grading, Drainage, Paving, Retaining Wall and Signals
Infrastructure
Bidding
$300,000 est. value
Nashville, TN 37076

Concrete Replacement and Asphalt Pavement
Post-Bid
Bartlett, TN

The Resurfacing on S.R. 13 From Near the Red River Bridge (L.M. 21.65) to Near Fairview Lane (L.M. 23.94)
Results
TN

Resurfacing on SR 57
Infrastructure
Bidding
$500,000 est. value
Memphis, TN 38138

Street Paving
Post-Bid
McKenzie, TN

The Resurfacing on S.R. 396 (Saturn Parkway) From U.S. 31 (S.R. 6) (L.M. 0.00) to Near I -65 (L.M. 4.11), Including Bridge Deck Repair
Results
TN

The grading, drainage, signals and paving on U.S. 127 (S.R. 28) from S.R. 68 to south of the bridge over Byrd's Creek (L.M. 9.70 - L.M. 10.57)
Infrastructure
Bidding
$300,000 est. value
Crossville, TN 38571

Asphalt Walking Trail
Post-Bid
Greenback, TN

The Resurfacing (Microsurfacing) on S.R. 52 from S.R. 53 (L.M. 20.58) to West of Poor House Road (L.M. 23.60)
Results
TN

Last Updated 06/08/2022 04:21 AM
Project Title

Resurfacing on U.S. 11E, S.R. 92, S.R. 341

Physical Address View project details and contacts
City, State (County) Morristown, TN   (Hamblen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. STP-34(123), 45006-8246-14 (PIN 127096.01) The resurfacing on U.S. 11E (S.R. 34) from L.M. 4.24 to L.M. 4.43. Project Length - 0.190 miles Project No. 45014-4206-04 (PIN 127128.00), 45014-4208-04 (PIN 127128.00) The resurfacing on S.R. 92 from U.S. 11E (S.R. 34) (L.M. 18.34) to near the Holston River (L.M. 23.96), including bridge expansion joint repairs. Project Length - 5.620 miles Project No. HSIP-341(52), 45S341-M8-002 (PIN 130402.00), 45S341-F3-002 (PIN 130402.00) The resurfacing on S.R. 341 from U.S. 11E (S.R. 34) in Hamblen County (L.M. 0.00) to near S.R. 66 in Jefferson County (L.M. 5.85). Project Length - 6.180 miles Total Contract Length - 11.990 miles Completion Time - On or before 9/30/2022 (See Special Provision 108B)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents