Similar Projects
Basalt River Park - Phase I & II
New Construction - 14,500 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

Meadows Community Center Playground Replacement
Post-Bid
Colorado Springs, CO 80905

Playground Engineered Wood Fiber Installation
Post-Bid
Greeley, CO 80631

Eastonville Regional Trail
Results
Colorado Springs, CO 80900

CO FLAP SUM 91(1), Fremont Pass Trail
Results
$3,000,000 to $5,000,000 est. value
Frisco, CO 80443

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

RiNo Art District
Renovation
Conception
Denver, CO 80205

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Estes Park Campground Playgrounds Design, Procure and Install Playground Equipment and Fall Zone Material
Post-Bid
Estes Park, CO 80511

CO FLAP DEN 56(1) Access Connections to ROAR
Results
$3,000,000 to $4,000,000 est. value
Commerce City, CO

Dry Lake Campground & Road Rehabilitation
Design
Steamboat Springs, CO

Stone Canyon Challenge Course Development
Post-Bid
Larkspur, CO 80118

Last Updated 04/23/2021 10:54 AM
Project Title

Pirates Cove Play Structure Improvement Project

Physical Address View project details and contacts
City, State (County) Littleton, CO 80120   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the removal and replacement of several pieces listed below of the current Kola WaterColors (SCS) Play System. The below listed components are to be removed and replaced with the same item or the owner will consider an alternative as long as the alternate will fit within the parameters of the existing structure, without impeding the current waterflow of the structure 1. Remove and replace 2 bridge assemblies to include the netting and all hardware. 107.5” x 41” netting 163” x 48” 2. Remove current enclosed slides and replace with two Dual Wave Open Slides 102” x 36.5” with 54” from deck to water surface 3. Remove current panel adjacent to current slides to accommodate new dual slides 4. Add at both Dual Slides 3-Rail Slide Entrance Frame 42.75” x 44” 5. Replace current Cow Bell panel with Elv Tip Trough 6. Replace and install five Hydro Blasters, owner will dictate which ones to be replaced 7. Remove and replace current Waterwheel Assembly 8” x 27” 8. Paint of new pieces to be determined by owner prior to shipping.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents