Last Updated | 11/10/2022 05:06 PM |
Project Title | New Groundwater Source Development - Town of Exeter |
Physical Address | View project details and contacts |
City, State (County) | Exeter, NH 03833 (Rockingham County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,509,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Additional groundwater sources are necessary to supplement the existing three groundwater sources (Stadium, Gilman and Lary Lane Wells) and the surface water sources (Exeter River & Exeter Reservoir) in accordance with the Town's Integrated Management Plan for water supply and to meet projected demands. The existing groundwater sources were developed in the 1950's and 1960's and are treated for iron, manganese and arsenic removal at the Lary Lane Groundwater Treatment Plant (GWTP) constructed in 2015, which has a capacity of 1.6 million gallons per day (MGD). Testing of the three existing wells in 2020 has indicated a total sustainable capacity of about 1 MGD, which is significantly less than originally projected. New groundwater supplies will allow more flexible rotation of the wells, allowing rest and recovery of all wells. If treatment is required, they can be piped to the GWTP to use the available capacity which the Town has already invested in. This will reduce the volume of water which must be treated at the Surface Water Treatment Plant which has a higher per-gallon treatment cost. Hydrogeologists and engineers working for the Town have identified 3 groundwater development zones where geophysical testing has been done and where test well work will be conducted in 2020 to identify the most favorable option to pursue. Once a site has been selected, next steps include well development and testing, permitting, production well installation, design and construction of a pumping station, access, electrical extension and piping to connect it to the existing system. As of November 10, 2022, this project is included in the Town of Exeter's FY 2023-2028 Capital Improvement Plan (CIP). Information regarding engineer firm and a firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |