Similar Projects
Sharp Warehouse III
New Construction, Infrastructure - 22,000 SF
Design
$1,500,000 CJ est. value
Rockwall, TX 75032

The Horizon at Fate Main
New Construction, Infrastructure - 51,587 SF
Design
$4,850,000 CJ est. value
Rockwall, TX 75087

Riding Club Road Realignment Project
Infrastructure
Bidding
$650,000 CJ est. value
Fate, TX 75087

Riding Club Road Realignment Project
Infrastructure
Bidding
$650,000 CJ est. value
Fate, TX 75087

Longbranch Road Improvement
Infrastructure
Post-Bid
Rockwall, TX

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Post-Bid
$10,000,000 CJ est. value
Royse City, TX 75189

Woodcreek Phase 8D - Excavation, Utilities and/or Paving
Infrastructure
Results
Fate, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Lefere Shell Office Building
New Construction, Infrastructure - 7,766 SF
Construction
$1,176,450 CJ est. value
Rockwall, TX 75087

Lefere Shell Office Building
New Construction, Infrastructure - 7,766 SF
Construction
$1,176,450 CJ est. value
Rockwall, TX 75087

Platform Rockwall
New Construction, Infrastructure - 77,234 SF
Pending Verification
$17,000,000 CJ est. value
Rockwall, TX 75087

Platform Rockwall
New Construction, Infrastructure - 77,234 SF
Pending Verification
$17,000,000 CJ est. value
Rockwall, TX 75087

Nicholson Premier Realty
New Construction, Renovation, Infrastructure - 1,800 SF
Design
Less than $112,000 est. value
Rockwall, TX 75032

Melody Ranch Channel Improvements
Infrastructure
Bidding
$350,000 CJ est. value
Fate, TX 75189

Construction of Earthwork Improvements to Serve Magnolia, Phase 10
Infrastructure
Post-Bid
$800,000 CJ est. value
Royse City, TX 75189

Last Updated 01/27/2023 03:32 AM
Project Title

FM 548 - Bridge Replacement

Physical Address View project details and contacts
City, State (County) Royse City, TX 75189   (Rockwall County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,090,390 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Ps&E Package Questions Call: Lane Selman, P.E. 2750 S Washington Kaufman, Tx 75142 972/962-3617 Length: 0.1810 Mi Time for Completion: 102 Working Days Limits from: at Parker Creek Limits to: . TXDOT - FM 548 - Bridge Replacement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents