Similar Projects
Highland Reservoir Pump Station Project - General
Renovation - 11,104 SF
Bidding
$700,000 CJ est. value
Pittsburgh, PA 15222

24" Transmission Main Contract
Infrastructure
Bidding
$875,000 CJ est. value
Hampton Township, PA 15101

Blower System
Renovation
Sub-Bidding
Chambersburg, PA 17201

Highland Reservoir Pump Station Project - Plumbing
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Pittsburgh, PA 15222

SCI Huntingdon - Replace Condensate
Alteration
Post-Bid
$1,000,000 to $2,000,000 est. value
Huntingdon, PA 16654

Gloninger Meadows Interior Renovations - Plumbing Construction
Alteration
Post-Bid
Lebanon, PA 17042

High School Athletic Improvements - Plumbing Construction
Alteration
Results
Claysburg, PA 16625

Various Buildings Water Cooler Replacement Phase 5 at Variiouis Buildings - Plumbing and Electrical
Alteration
Results
Pittsburgh, PA

Replacement Of 300,000 Gallon Leachate Storage Tank
Infrastructure
Construction
$1,308,200 CJ est. value
Lebanon, PA 17046

Water Resource Recovery Facility - Contract 22-02 Electrical Construction
Renovation
Post-Bid
$9,482,700 CJ est. value
Dubois, PA 15801

South Park Administration Building HVAC - Heating, Ventilating and Air Conditioning/Plumbing
Alteration
Results
South Park Township, PA 15129

Water Resource Recovery Facility - Contract No. 22-03 HVAC Construction
Renovation
Post-Bid
$2,815,000 CJ est. value
Dubois, PA 15801

Neshaminy New Maple Point Elementary School - Plumbing Construction
Alteration
Results
Langhorne, PA 19047

Water Resource Recovery Facility Project - Contract No. 22-04 Plumbing Construction
Renovation
Post-Bid
$1,249,990 CJ est. value
Dubois, PA 15801

LCCC Touchless Fixtures
Alteration
Results
Allentown, Schnecksville, Tamaqua, PA 18078

Last Updated 08/15/2023 04:15 PM
Project Title

Water Conservation Improvements Project (Rebid)

Physical Address View project details and contacts
City, State (County) Shenandoah, PA 17976   (Schuylkill County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $298,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of the installation of 4 concrete conservation release weirs on the bypass streams of the Ringtown No. 6, Ringtown No. 5, and Raven Run No. 2 reservoirs as well as installation of 2 flowmeters on raw water transmission mains between Ringtown No. 6 to Ringtown No. 5 and Ringtown No. 5 to Raven Run No. 3 reservoirs. A certified check or bank draft, payable to the order of the Municipal Authority of the Borough of Shenandoah or a satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10 percent of the Total Bid shall be submitted with each bid. The SUCCESSFUL BIDDER will be required to furnish and pay for satisfactory Performance and Payment Bond, each in the amount of 100 percent of the Contract Price with a corporate surety approved by the Owner. PA Prevailing Wage Rates apply. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Question Deadline 08/14/2023 at 5:00 PM ET Clarification Deadline If a site visit is needed by the Contractor, please contact the MABS office via telephone at 570-462-1904 to notify the main office that you will be entering the property. The Contractor must provide the timeframe that they will be onsite for security purposes. The facilities themselves can be accessed by foot. The Owner and Engineer are not available for a site visit. Of Special note, Ringtown No. 5 Dam can be accessed from Reservoir Road for the purpose of the site visit, but vehicular traffic will be allowed through Pump House Lane during construction A certified check or bank draft, payable to the order of the Municipal Authority of the Borough of Shenandoah or a satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10 percent of the Total Bid shall be submitted with each bid.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents