Similar Projects
2021 Cemetery North Addition - Phase I
Addition, Infrastructure
Results
Kearney, NE

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Central ES / Merryman Performing Art Center
New Construction
Post-Bid
$700,000 est. value
Kearney, NE 68845

Elm Creek Public Schools Addition and Renovation
Renovation, Addition, Demolition - 44,380 SF
Post-Bid
Elm Creek, NE 68836

Northwest Industrial Site Development - Utility Improvements
Infrastructure
Results
Elm Creek, NE

Kearney Regional Airport (EAR) Terminal Expansion
Addition, Demolition, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Kearney, NE 68847

2022 Part 2 Improvements - 56th Street & Avenue N Turning Lanes
Infrastructure
Bidding
$560,000 CJ est. value
Kearney, NE 68847

Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

Evergreen Road Paving - County of Buffalo
Infrastructure
Pending Verification
$250,000 CJ est. value
Kearney, NE 68847

Rural Health Complex - University of Nebraska at Kearney
New Construction, Infrastructure
Pending Verification
$85,000,000 CJ est. value
Kearney, NE 68849

Culverts, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kearney, NE 68847

Bridges, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Beaver, NE 68869

Driveway Replacement - Single Family Homes
Infrastructure
Bidding
Kearney, NE 68847

2023 Paving Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Kearney, NE 68847

Last Updated 11/17/2022 02:09 PM
Project Title

New Elementary School - Elm Creek Public Schools

Physical Address View project details and contacts
City, State (County) Elm Creek, NE 68836   (Buffalo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $11,980,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to construct 44,000 square-foot building. As of November 17, 2022, this project is currently under construction and anticipated to be completed Fall of 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents