Similar Projects
Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Bowie High School - Phase 4 - 2019 Bond - Arlington Independent School District
Addition, Infrastructure, Renovation
Conception
$13,295,613 CJ est. value
Arlington, TX 76018

Fort Worth Country Day Lower School
New Construction, Infrastructure - 30,384 SF
Design
$12,862,400 CJ est. value
Fort Worth, TX 76109

Bethlehem Baptist Church
New Construction - 55,000 SF
Design
$25,000,000 est. value
Mansfield, TX

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Duff Elementary School Additions & Renovations and S. Davis Elementary School Renovations
Addition, Demolition, Infrastructure
Bidding
$8,313,900 CJ est. value
Arlington, TX 76010

Trail Lakes Apartments
New Construction, Infrastructure - 45,000 SF
Post-Bid
$6,500,000 CJ est. value
Fort Worth, TX 76133

Eagle Mountain-Saginaw ISD Elementary #18: Remaining Trades
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Fort Worth, TX 76179

KBR Yard Piping and Inlet and Outlet Modifications
Results
$40,000,000 est. value
Kennedale, TX

2020 Waterline Renewal Project
Infrastructure
Results
$900,000 est. value
Benbrook, TX 76116

Key School
New Construction
Construction
Fort Worth, TX 76119

Murphy Express #8961 / Bedford
New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Bedford, TX 76021

Stonemont-Harmon Road / Harmon Road Spec Warehouse
New Construction, Infrastructure - 485,680 SF
Pending Verification
$20,446,233 CJ est. value
Fort Worth, TX 76177

Kirkwood Oaks - Addition and Site
Addition, Demolition, Infrastructure - 4,300 SF
Pending Verification
$2,500,000 CJ est. value
Southlake, TX 76092

Emergency Operations Center (EOC) Relocation Project - City of Southlake
Demolition, New Construction, Infrastructure - 3,000 SF
Conception
$1,703,000 CJ est. value
Southlake, TX 76092

Last Updated 03/17/2023 03:33 PM
Project Title

Water Distribution System Improvements S. Pearson Lane & Union Church Road E. Dove Road & Oak Bend Court Loop

Physical Address View project details and contacts
City, State (County) Southlake, TX 76092   (Tarrant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,320,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The cost estimate is $1.35M for the water line portion and $280K for the sidewalk portion of this project. Questions regarding distribution of Contract Documents and design related questions for this project shall be directed to Baird, Hampton & Brown ( Lindsay Lafferty at llafferty@bhbinc.com.. Email questions to Lindsay Lafferty at llafferty@bhbinc.com. All questions concerning this project shall be submitted by 5:00 PM on Wednesday, February 22nd, 2023. Any questions submitted after this time and date will not be addressed. This project generally consists of constructing approximately 1,874 LF of 12" PVC water main pipe by open trench construction and approximately 1,970 LF of 12" PVC water main pipe by trenchless construction methods. This project also provides for the looping of a small section of 8" water main to an existing 6" water main. Additionally, this project includes the construction of approximately 2,761 SY of 4" thick concrete sidewalk in the parkway as Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within ten (10) days of Notice of Award of the contract. The security must be payable to the City of Southlake in the amount of five percent (5%) of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Contractors for this Project must pay no less than the prevailing wage rates for the area established by the Owner and included in the contract documents. Performance, Payment and Maintenance Bonds, bound to the City of Southlake are required, each in an amount of not less than one-hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor or furnishing materials.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents