Similar Projects
Hayes Elementary School Construction
New Construction
Conception
Ada, OK

Union Elementary School Renovations
Renovation
Conception
Ponca City, OK 74601

Washington School Replacement - 2021 Bond - Ada City School District
New Construction
Design
$37,000,000 est. value
Ada, OK

Elementary School Renovations
Renovation
Design
$26,010,000 est. value
Yukon, OK

Peters Elementary HVAC Replacement
Renovation
Bidding
$300,000 CJ est. value
Broken Arrow, OK 74012

Quapaw Public Schools Elementary Storm Shelter Addition and Roof Replacement and High School Blecher Expansion and Restroom Renovation
Renovation
Bidding
$1,800,000 CJ est. value
Quapaw, OK 74363

Upper Elementary and Early Childhood Center Additions
Addition
Post-Bid
Collinsville, OK 74021

Surrey Hills Classroom Addition
Addition
Post-Bid
Yukon, OK 73099

Maud Public Schools Storm Shelter
Renovation
Results
Maud, OK 74854

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

St. Mary's Episcopal School
Addition
Construction
Edmond, OK 73034

The Learning Experience
New Construction
Construction
Broken Arrow, OK 74012

South Elementary School
New Construction, Addition
Pending Verification
Tulsa, OK 74107

North Elementary School
Renovation
Pending Verification
Bixby, OK 74008

Spring Creek Elementary School Classroom Addition
Renovation, Addition
Conception
$5,520,000 est. value
Edmond, OK 73013

Last Updated 04/06/2023 03:41 PM
Project Title

Pryor Public Schools Jefferson & Lincoln Renovations

Physical Address View project details and contacts
City, State (County) Pryor, OK 74361   (Mayes County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,700,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations for the Jefferson Elementary and Lincoln Elementary including roof, window and interior renovations. Lincoln Elementary location is 1625 S Elliot, Pryor, OK. 74361 and Jefferson Elementary location is 400 SE 6th, Pryor, OK. 74361 As of February 1, 2023, a construction manager has been chosen. Plans anticipated to be available February 9, 2023 or after. Construction is anticipated to begin second quarter 2023. Every request for such interpretation should be in writing, via email to Hutton Lowry, Lowry Construction Services, hutton@lowrycs.com, and to be given consideration, must be received no later than 5:00 pm on March 01, 2023. The Work includes items drawn, detailed, and specified for Architectural, Mechanical, Electrical, Plumbing, Civil and Structural disciplines as identified in the contract documents.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents