Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Concrete Flooring Repairs Laurel Highlands High School
Renovation
Sub-Bidding
$37,950 CJ est. value
Uniontown, PA 15401

Concrete Surface Preparation in Advance
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Scranton, PA 18503

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Borough Garage Concrete Pad Project
Alteration
Results
Robesonia, PA

Hickory Run State Park - Latrine Improvements
Renovation
Construction
$11,999,884 CJ est. value
White Haven, PA 18661

Fisherman's Cove (T-370) Bridge
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Polk, PA 16342

2023 Sly Street Paving Project
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Luzerne, PA 18709

Transfer Station Complex Tipping Floor Repair Project
Alteration
Results
Lancaster, PA 17603

Spring and Cavalry Roads
Infrastructure
Bidding
$5,000,000 CJ est. value
South Middleton Township, PA 17013

Truck Scale System Rebuild Project
Alteration
Results
Montgomery, PA 17752

SR 11 Wyoming County Resurfacing - 2023
Infrastructure
Bidding
$2,499,999 CJ est. value
Nicholson, PA 18446

Concrete Repairs at South Park Wave Pool III
Alteration
Results
Bethel Park, PA 15102

Last Updated 05/05/2023 03:36 PM
Project Title

Roadway Asphalt Milling

Physical Address View project details and contacts
City, State (County) Allentown, PA 18101   (Lehigh County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $173,008 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 5, 2023, project was awarded to Rota-Mill Inc., awarded amount is $173,008.32.** Bids must be accompanied by a certified check or bid bond, with a corporate surety authorized to do business in Pennsylvania in accordance with the project specifications in the amount of ten percent (10%) of the total bid amount. Payment and Performance Bonds in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening. This project is subject to Pennsylvania Prevailing Wage Act and the prevailing wage rates are incorporated in the bid documents. Attention is called to the fact that no less than the minimum salaries and wages set forth in the Contract Documents must be paid, and that the employees are not discriminated against because of their race, color, religion, sex, or national origin. Any questions related to this bid solicitation should be submitted using the "QUESTIONS" feature within PennBid no later than five (5) days prior to the bid opening. South Whitehall Township reserves the right to reject any and all bids, and to accept either in whole or in part, any one bid or combination of bids and to accept the bid which it determines in its best interests. The Township also reserves the right to waive or permit the curing of any informalities or irregularities in a bid as permitted by law. The Contractor shall be required to perform all temporary measures required to provide smooth, safe, driving conditions during the execution of the work. All driveway edges, milling edges, valve boxes or manholes shall be left completely smooth and protected at all times. Any condition caused by the work which creates an unsafe or unacceptable condition as determined by the Township shall be corrected immediately. The Contractor shall install temporary millings or other approved material to protect, fill or taper any such condition and shall maintain the temporary work until the final work has been completed and accepted by the Township. If the Contractor fails to immediately correct any unacceptable condition, after verbal notification by the Township, then the Township reserves the right to utilize its own forces, or other forces and deduct all associated expenses from the Contractor's payment for the project. Clarification Deadline: 3/4/2023 4:00 PM

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents