Similar Projects
The Collection Mixed-Use Development
Renovation - 35,000 SF
Conception
Loveland, CO 80538

Prospect and I 25 Mixed Use Development
New Construction
Conception
Fort Collins, CO 80524

Flats at Hansen Farm
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Fort Collins, CO 80528

Old Town North Apartment
New Construction
Design
$40,000,000 est. value
Fort Collins, CO 80524

Floor and Décor / Fort Collins
New Construction - 78,033 SF
Post-Bid
$15,000,000 CJ est. value
Fort Collins, CO 80528

Safe Water Action Program General Contractor
Infrastructure
Post-Bid
Fort Collins, CO

Parks and Recreation Irrigation Mainline Replacement
Infrastructure
Results
$272,275 CJ est. value
Loveland, CO 80537

US 36 Highway and Community Drive Roundabout
Infrastructure
Results
$2,987,737 CJ est. value
Estes Park, CO 80517

Dollar General #23039
New Construction - 9,660 SF
Construction
$750,000 est. value
Loveland, CO 80537

AutoZone #5429
Renovation - 21,493 SF
Construction
$500,000 to $1,000,000 est. value
Fort Collins, CO 80525

Worthington Storage
New Construction, Infrastructure - 85,200 SF
Pending Verification
$9,200,000 CJ est. value
Fort Collins, CO 80526

The Overland by Balfour Senior Living Development
New Construction, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Fort Collins, CO 80528

Ledge Rock Center
New Construction - 750,000 SF
Conception
Johnstown, CO 80534

Enclave at Redwood
New Construction, Infrastructure
Design
$91,000,000 CJ est. value
Fort Collins, CO 80524

Sam's Club #8147-604 - CAPXHVAC-1
Renovation
Post-Bid
Loveland, CO 80537

Last Updated 04/27/2023 09:40 AM
Project Title

5041 Technology Parkway Warehouse and Showroom

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80528   (Larimer County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new light industrial and warehouse showroom and retail building. As of April 2023, the project has been canceled.

Details

1 Story Above Grade, 50,960 SF, 198.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Laboratory Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents