Similar Projects
Municipal Water Well Abandonment
Infrastructure
Bidding
$300,000 est. value
Bartlett, IL 60103

Water Well No. 9 Rehabilitation
Infrastructure
Bidding
$2,000,000 est. value
Elk Grove Village, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Replace Pump 8 and Install New VFD for Pump 13 at the Touhy Avenue Pump Station
Infrastructure
Post-Bid
Niles, IL 60714

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Water Treatment Plant High Service Pump Replacement
Results
Chicago, IL

Furnish and Deliver Sump Pumps to Various Locations for a One-year Period
Term Contract
Bidding
$38,000 est. value
Chicago, IL

Well Sealing Villa Santa Maria Convent
Infrastructure
Post-Bid
Less than $25,000 est. value
Oak Forest, IL 60452

CPS Burbank ES Chilled Water Pump Replacement
Renovation
Results
Chicago, IL 60639

Inspection, Preventative Maintenance, Repair, Replacement of VFD Pumps
Term Contract, Infrastructure
Post-Bid
Chicago, IL

CPS Walt Disney Magnet Ejector Pump Loading Dock Replacement
Results
Chicago, IL 60613

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Post-Bid
Glenview, IL

CPS Haines ES Booster Pump Replacement
Term Contract
Results
Chicago, IL 60616

Pentair Hydromatic Pumps
Infrastructure
Post-Bid
Chicago, IL

Water Supply Well No. 4 Abandonment
Infrastructure
Results
Mount Prospect, IL

Last Updated 05/21/2022 01:32 AM
Project Title

Water Station Electrical Improvements - Pump and Motor Replacement - All Stations

Physical Address View project details and contacts
City, State (County) Schaumburg, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $2,566,741 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project would replace these pumps and motors over five fiscal years. FY 22/23 - Station 3 (pump 1), Station 20 (pump 2) FY 23/24 - Station 3 (pump 3 and motor) and station 12 (pumps 1,2,3 and three motors) - both built in 1969 FY 24/25 - Stations 19 (pumps 1,2,3,4 and four motors), 1 VFD, and station 20 (pump 3 and three motors) - built in 1978 and 1980 respectively FY 25/26 - Stations 21 (pumps 1,2,3 and three motors) and station 2 (pumps 1,2-$220,000 and two motors), 1 VFD - built in 1969 and 1990 respectively FY 26/27 - Station 22 (pumps 1,2 and two motors-$90,000) - built in 1996

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents