Similar Projects
Residential Septic Tank Installation and Repair
Infrastructure
Bidding
$50,000 est. value
Birmingham, AL

2022 On-Call Sewer Services
Infrastructure
Post-Bid
$2,350,000 est. value
Birmingham, AL

2022 AMP07 Sewer Replacement
Infrastructure
Post-Bid
$4,400,000 est. value
Birmingham, AL

Swan Creek Trunk Sewer Improvements - Phase 2
Results
$1,364,640 est. value
Birmingham, AL

Residential Septic Tank Installation and Repair
Results
Birmingham, AL

Hoover High School PS Comprehensive Rehabilitation
Infrastructure
Post-Bid
$2,000,000 est. value
Hoover, AL 35244

Manhole Sewer Covers
Term Contract
Results
Birmingham, AL

2022 Sewer Rehabilitation
Infrastructure
Post-Bid
$5,300,000 est. value
Birmingham, AL

Tin Mill Road Sanitary Sewer Replacement
Results
$4,000,000 to $4,300,000 est. value
Birmingham, AL 35232

Sewer Manhole Components
Infrastructure
Post-Bid
Birmingham, AL

Service Lateral Inspections
Results
$1,600,000 to $1,800,000 est. value
Birmingham, AL

Sanitary Sewer System - Asset Management Program
Infrastructure
Post-Bid
$400,000 est. value
Birmingham, AL

Sanitary Sewer System Asset Management Program - 2021
Results
$16,000,000 to $18,000,000 est. value
AL

Sewer Storm Surge Access Assembly
Term Contract
Post-Bid
Birmingham, AL

Sanitary Sewer System - Asset Management Program - Sewer Replacement Contract 1
Infrastructure
Results
$5,000,000 est. value
Birmingham, AL

Last Updated 07/11/2022 03:16 PM
Project Title

2021 AMP01 - Highway 150 I-459 Force Main Renewal

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35249   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the installation of a lining system in approximately 1,700 feet of an existing 18-inch ductile iron pipe sewer force main, providing temporary flow control, replacement of existing air release valve and manhole, and rehabilitation and installation of a monolithic liner in two manholes. The excavation portion of this project is classified as a class “B” sewer line project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents