Similar Projects
T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

The Coronet At 21st
New Construction, Infrastructure - 2,587 SF
Design
$4,200,000 CJ est. value
Harrisburg, PA 17101

Home2Suites Hotel / Swatara Township
New Construction, Infrastructure - 64,878 SF
Design
$8,000,000 CJ est. value
Swatara, PA 17111

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

Bethel Village
New Construction, Infrastructure - 46,784 SF
Post-Bid
$12,000,000 CJ est. value
Harrisburg, PA 17102

Eshelman Street, George, Concord, and Poplar Alleys (2020/2021 CDBG) Project
Infrastructure
Results
Highspire, PA 17034

Front Street Interceptor Rehabilitation - Phase 2
Infrastructure
Results
$15,742,837 CJ est. value
Harrisburg, PA 17110

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

Eisenhower Boulevard Flexible Space Building
New Construction, Infrastructure - 78,000 SF
Pending Verification
$8,000,000 CJ est. value
Middletown, PA 17057

I-83 South Bridge Project
Demolition, New Construction, Infrastructure
Pending Verification
$650,000,000 CJ est. value
Hummelstown, PA 17036

Fairville Avenue over I-81
Infrastructure, Renovation
Conception
$2,725,000 CJ est. value
Hummelstown, PA 17036

Eisenhower Interchange
Infrastructure
Design
$158,200,000 CJ est. value
Swatara, PA 17111

23NW SGL 95 Well Drilling
Infrastructure
Post-Bid
$250,000 CJ est. value
Harrisburg, PA 17102

Last Updated 08/24/2023 12:48 PM
Project Title

Market Street Bridge East

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17102   (Dauphin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $27,872,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.mdjonline.com/tribune/regional/how-to-get-a-look-at-plans-to-fix-harrisburg-s-market-street-bridge/article_576beeed-8680-53d3-8251-497c24609a78.html July 27, 2023 PennDOT will hold a public meeting Aug. 1 on the proposed overhaul of the Market Street Bridge, a project that is expected to begin construction in 2025. The Market Street Bridge, built in 1928, crosses the Susquehanna River, connecting Harrisburg with Wormleysburg and Lemoyne and giving access to City Island. The bridge is made up of two 16-arch structures, an eastern and western span. The ... __________________________________________ https://www.mdjonline.com/tribune/regional/penndot-announces-online-plans-public-meeting-for-market-street-bridge-rehabilitation-project/article_cb43a83c-0332-54e9-a3c1-21bb36bacb88.html PennDOT announces online plans, public meeting for Market Street Bridge rehabilitation project Maddie Seiler, The Sentinel, Carlisle, Pa.Jun 29, 2023 Jun. 29--Plans for updates to the Market Street Bridge between Cumberland and Dauphin counties and the installation of a separate utility bridge are set to move forward, PennDOT announced Thursday. The Market Street Bridge carries Route 3012 from Lemoyne and Wormleysburg on the Susquehanna River's West Shore to City Island and beyond the City of Harrisburg on the East Shore. Work includes __________________________________________________________________________________________________________________ SR 3012 (Market Street) East Bridge over the Susquehanna River City of Harrisburg As of March 09, 2023, the project is in development stage. The owner is in the community outreach input phase. Anticipated letting date is March 21, 2024. PennDOT - Market Street Bridge East *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents