Similar Projects
Drainage Outfall Check Valves
Infrastructure
Bidding
Gulf Stream, FL

Pond and Canal Maintenance
Infrastructure
Bidding
$350,000 est. value

East Lake Village Storm Water Improvement Project
Post-Bid
Pahokee, FL

Stormwater Drain Improvements - Culvert Extension
Results
Boca Raton, FL 33431

Emergency Utility Repairs for Water, Wastewater and Stormwater
Results
Lake Worth, FL 33460

Utility Infrastructure Repairs and Replacements
Infrastructure
Bidding
Jupiter, FL 33458

Drainage Clean/Video/GPS
Results
Less than $250,000 est. value
FL

Districtwide Storm Sewer Inspection
Infrastructure
Bidding

Stormwater Utility Infrastructure Repairs Unit Price Contract
Results
Jupiter, FL 33458

Miscellaneous Public Works Projects
Term Contract
Results
Less than $1,000,000 est. value
Palm Beach Gardens, FL 33410

Washington Road Improvements
Results
$850,000 est. value
West Palm Beach, FL 33405

Stormwater Infrastructure Maintenance and Repair Services
Term Contract
Results
Palm Beach Gardens, FL 33410

Carol and Rex Avenue Stormwater Improvements
Results
Palm Springs, FL 33461

Camino Real, Military Trail to SW 7th Avenue
Results
West Palm Beach, FL 33411

Procurement of Stormwater Inline Drainage Check Valve
Results
Jupiter, FL 33458

Last Updated 08/02/2021 02:50 AM
Project Title

Stormwater Utility Swale Rehabilitation Unit Price Contract (S2134)

Physical Address View project details and contacts
City, State (County) Jupiter, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Swale rehabilitation and select driveway replacements within the Town of Jupiter, as requested by the Town on an as needed basis, utilizing one or a combination of unit price bid items, including but not limited to removal and disposal of existing sod, survey, regrading/re-establishment of swale flow lines, sodding, concrete curbs, concrete valley gutters, concrete driveway replacements from edge of pavement to right of way line (as needed to correct swale flow lines), concrete sidewalks, asphalt roadway repairs to existing edge of pavement, asphalt pathway replacements, asphalt driveway replacements from edge of pavement to right of way line (as needed to correct swale flow lines), paver driveway replacements (as needed to correct swale flow lines),irrigation repairs, irrigation adjustments and all other work required to properly re-establish and restore swales to facilitate proper stormwater drainage. The contractor will be responsible for legal, offsite disposal of all excess fill, concrete, asphalt and debris generated from the work. The initial term of the Contract is one calendar year and the Contract contains a provision for three individual and consecutive annual renewals, at the Town’s discretion.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents