Similar Projects
Middle TN MHI Mechanical Equipment Replacement
Alteration
Bidding
$2,000,000 to $4,000,000 est. value
Nashville, TN 37214

Power Plant Equipment and Lighting Upgrades
Alteration
Bidding
Nashville, TN

Furnish Labor and Materials for Boiler, Piping, and Duct Insulation Projects
Post-Bid
Chattanooga, TN 37421

Furnish and Install Mechanical Equipment, Materials, and Supplies
Term Contract
Post-Bid
TN

Cooling Tower Replacement at Independence High, Chapmans Retreat ES, Heritage ES and Boiler Replacement at Kenrose ES, Heritage ES, Westwood ES
Results
Brentwood, Fairview, Spring Hill, Thompson's Station, TN 37179

Headworks Slide Gates and Installment
Results
Crossville, TN

Heating Ventilation Air Conditioning (HVAC ) and Replacement and Support of Boilers and Chillers
Alteration
Bidding
Jellico, TN

TSU MPE Systems Upgrades
Post-Bid
McMinnville, TN 37110

Morton Filter Valve Replacement
Results
Memphis, TN 38128

Hot Water Heater Replacement
Post-Bid
Collierville, TN 38017

WTP Filter Repairs
Results
Ashland City, TN 37015

Boiler Replacement at Shelbyville Recreation Center
Post-Bid
Shelbyville, TN 37160

Walk-in Freezer/Cooler Vine Middle School
Results
Knoxville, TN 37915

112.5 KVA Pad Transformer
Term Contract, Alteration
Post-Bid
Cookeville, TN

TRC Smyrna Campus Systems Upgrade
Results
Smyrna, TN 37167

Reported 11/11/2021 12:00 AM
Project Title

Boiler Replacement

Physical Address View project details and contacts
City, State (County) Ripley, TN 38063   (Lauderdale County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at the Tennessee College of Applied Technology - Ripley, Tennessee. Replace existing 2,000 MBTU gas fired boiler with a new high efficiency boiler with new controls by the boiler manufacturer, connect existing hot water supply and return piping to new boiler, extend new intake and exhaust flue from boiler up through roof, and balance existing hot water pumps for new hot water flow rate. Add Alt. #1 - Water heater WH-1.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents