Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Install New Amphitheater Shade Structure - PK-04 - City of Foster City
Infrastructure
Conception
$900,000 CJ est. value
Foster City, CA 94404

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

The Peninsula Wellness Community
New Construction, Infrastructure - 100,000 SF
Design
$216,000,000 CJ est. value
Burlingame, CA 94010

Chavez Ravenswood Middle School New Construction and Modernization
New Construction
Post-Bid
$33,000,000 est. value
East Palo Alto, CA 94303

RFP Engineering - Redwood Shores Isolation Valve Installation Project
Infrastructure
Post-Bid
$175,000 CJ est. value
Redwood City, CA 94063

Half Moon Bay High School AG Project
Renovation
Results
Half Moon Bay, CA 94019

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Southline Office and Lab Development
New Construction, Infrastructure - 2,659,000 SF
Construction
$426,000,000 CJ est. value
South San Francisco, CA 94080

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

Bell Lofts
New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
San Bruno, CA 94066

Cabrillo Highway Phase 1B-3b, Phase 4 - Montara Water And Sanitary District
Infrastructure
Conception
$5,195,985 CJ est. value
Montara, CA 94019

El Camino Real Multi-Residential
New Construction, Infrastructure - 504,000 SF
Design
$117,000,000 CJ est. value
Burlingame, CA 94010

La Entrada Middle School and Las Lomitas Elementary School Districts Modernization Projects
Renovation
Post-Bid
Menlo Park, CA 94025

Last Updated 04/26/2023 05:34 PM
Project Title

Borel Middle School Shade Structures

Physical Address View project details and contacts
City, State (County) San Mateo, CA 94402   (San Mateo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,189,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of: All the work covered on the drawings except erecting the shade structure. This includes but is not limited to: demolition of existing surfaces, all tree work (under the observation/guidance of District arborist), all related site work, UG work, Path of Travel work, ADA upgrades to Path of Travel and restrooms, plumbing, electrical, & temporary fencing around all work areas. As security for its Bid, each bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Bid Period questions about this project are to be submitted in writing to the architect: kbailey@aedisarchitects.com and cc:rprice@smfcsd.net The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awardsthe Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents