Similar Projects
RFP Design - Professional Services
Term Contract
Conception
Baton Rouge, LA 70802

RFQ Engineering - LCDBG Coronavirus HVAC Improvements Grant
Renovation
Conception
$482,900 CJ est. value
Baton Rouge, LA 70802

Renovations to East Wing A.O. Williams Hall
Renovation
Post-Bid
$3,325,000 est. value
Baton Rouge, LA

Construction Management Services
Renovation
Post-Bid

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Regional Design/Build General Construction Indefinite Delivery Indefinite Quantity (IDIQ)
New Construction
Results

Renovations and Additions, Louisiana Governors Mansion, State Capitol Park
Addition, Demolition, Renovation, Infrastructure
Construction
$450,000 CJ est. value
Baton Rouge, LA 70802

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

East Baton Rouge Parish First Responder Safe Room and Training Center
New Construction
Results
Baton Rouge, LA 70807

New Training Building
New Construction
Post-Bid
Baton Rouge, LA

Building/Construction Management Selected Services
Renovation
Post-Bid
Baton Rouge, LA 70873

East Baton Rouge Parish First Responder Safe Room/Training Center
New Construction
Post-Bid
Baton Rouge, LA

Zachary Municipal Building
New Construction - 31,832 SF
Post-Bid
$10,000,000 est. value
Zachary, LA 70791

Ephesus Lighting for B. R. Raising Canes River Center
Renovation
Post-Bid
$70,000 CJ est. value
Baton Rouge, LA 70802

RFQ Construction Management at Risk (CMAR) - EAT Fat City Center
Renovation
Post-Bid
$15,000,000 CJ est. value
Baton Rouge, LA 70802

Last Updated 04/07/2023 04:07 PM
Project Title

State Capitol Formal Gardens Restoration (Phase 1) State Capitol Park

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70802   (East Baton Rouge County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $280,318 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 28th, 2022 - All Bids Have Been Rejected for exceeding the funds available. ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY FACILITY PLANNING AND CONTROL OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE BID OPENING. FOR: State Capitol Formal Gardens Restoration (Phase 1) State Capitol Park Baton Rouge, Louisiana PROJECT NUMBER: 01-107-93B-12, F.01004277 Complete Bidding Documents for this project are available in electronic form. They may be obtained without charge and without deposit from Reich Landscape Architecture. Printed copies are not available from the Designer but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs. Questions about this procedure shall be directed to the Designer at: Reich Landscape Architecture 301 TJ Jemison Blvd. Baton Rouge, LA 70802 Telephone: 225-336-5890 E-mail: bill@reichla.com All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Landscaping, Grading and Beautification. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed. Facility Planning and Control is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the Veteran-Owned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation. Information is available from the Office of Facility Planning and Control or on its website . STATE OF LOUISIANA DIVISION OF ADMINISTRATION FACILITY PLANNING AND CONTROL JASON SOOTER, DIRECTOR

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents