Similar Projects
O'Reilly Auto Parts (OH1) / Olivehurst
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Olivehurst, CA 95961

Rehabilitate Pavement, Add Bike Lanes, Rehabilitate Drainage Systems, Upgrade Facilities to ADA Standards
Infrastructure
Design
$9,087,000 CJ est. value
Olivehurst, CA 95961

Rehabilitate Pavement, Add Bike Lanes, Rehabilitate Drainage Systems, Upgrade Facilities to ADA Standards
Infrastructure
Design
$9,087,000 CJ est. value
Olivehurst, CA 95961

Access Roads, Pads and Caisson Foundations for Beale Transmission Line Construction
Infrastructure
Bidding
$5,000,000 CJ est. value
Beale AFB, CA 95903

Access Roads, Pads and Caisson Foundations for Beale Transmission Line Construction
Infrastructure
Bidding
$5,000,000 CJ est. value
Beale AFB, CA 95903

ARW Squad Ops and AMU Complex- Beale AFB
New Construction, Infrastructure - 49,112 SF
Post-Bid
$50,000,000 CJ est. value
Beale AFB, CA 95903

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

River Oaks Family Apartments Phase 1
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Plumas Lake, CA 95961

Paint Bridge Walls, Reconstruct and Extend Sidewalks, Paint Concrete Pedestrian Bridge
Infrastructure
Design
$806,000 CJ est. value
Marysville, CA 95901

Beale Air Force Base Substation Construction Contract
Infrastructure
Bidding
$10,000,000 CJ est. value
Beale AFB, CA 95903

Dutch Bros / Marysville
New Construction, Infrastructure - 950 SF
Post-Bid
$500,000 CJ est. value
Marysville, CA 95901

2022 CSA Resurfacing Projects
Infrastructure
Results
$1,188,257 est. value
Marysville, CA

River Oaks Family Apartments Phase 2
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Plumas Lake, CA 95961

Last Updated 07/11/2023 02:49 PM
Project Title

Packard Avenue Parking Project

Physical Address View project details and contacts
City, State (County) Marysville, CA 95901   (Yuba County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $633,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general consists of constructing sidewalks, ADA compliant ramps, paving, striping, storm drains, and safety lighting along Packard Avenue from Hammonton Road West to Sharp Avenue. Question Submission Deadline:June 28, 2023, 2:00pm Complete the work within 45 working days. Each bid shall be accompanied by a certified cashier's check, or bid bond, in the amount of 10 percent of the total bid price, payable to Yuba County Department of Public Works, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents