Similar Projects
Sanitary Sewer Lift Station 6 Replacement
Renovation
Bidding
$3,200,000 est. value
Edina, MN 55435

Lift Station Rehabilitation Project
Renovation
Post-Bid
Medicine Lake, MN

Lift Station No. 8 Improvements
Renovation
Post-Bid
Brooklyn Center, MN

Construction of a Booster Station
Results
Less than $350,000 est. value
Saint Louis Park, MN 55426

Rehabilitation of Lift Station 6
Renovation
Results
Brooklyn Park, MN

Utility Improvements
Results
Minnetrista, MN

2021 Lift Station Improvements
Renovation
Results
Mound, MN

Eden Avenue and Brookside Avenue Improvements
New Construction
Results
$3,500,000 est. value
Edina, MN 55435

Lift Station No. 14 Rehabilitation
New Construction
Results
Bloomington, MN 55437

Lift Station 7 and 10 Rehabilitation
Renovation
Results
Shorewood, MN

Mission Farms Lift Station Rehabilitation
Renovation
Results
Plymouth, MN

Rosland Park BMP Project
Renovation
Results
$750,000 est. value
Edina, MN 55435

2021 Opus Lift Station Secondary Force
Renovation
Results
$291,835 est. value
Minnetonka, MN

2022 Lift Station Improvements
Renovation
Results
Mound, MN

Lift Station 7, 9 and 10 Rehabilitation
Renovation
Results
Shorewood, MN

Last Updated 06/15/2022 01:36 AM
Project Title

Excelsior Boulevard Lift Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Excelsior, MN 55331   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the furnishing of all labor and materials necessary for the construction complete in-place, that includes but is not limited to the following: A. Removal and replacement of existing wet well equipment and pumps. B. Rehabilitation of the existing wet well including pouring a new concrete floor and recoating all concrete surfaces. C. Removal and replacement of piping from the wet well to the isolation valves in the existing valve vault. D. Bypass pumping. E. Televising and locating of an upstream existing manhole. F. Installation of new control panel and controls. G. Installation of new backup natural gas emergency generator. Additonal Description: The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Excelsior shall comply with the provisions of the statute.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents