Similar Projects
Public Works Garage Cold Storage Addition
Addition, Demolition, Infrastructure
Design
$60,000 CJ est. value
Tremont, ME 04653

Design Review - Peekytoe Provisions
New Construction, Infrastructure - 2,500 SF
Design
$650,000 CJ est. value
Bar Harbor, ME 04609

Paving Replacement Project at Beech Hill School
Infrastructure
Post-Bid
Otis, ME 04605

Road Paving
Infrastructure
Post-Bid
Swans Island, ME

Paving
Results
Hancock, ME

Paving Project at Union River Estates
Results
Ellsworth, ME 04605

Rehabilitate Parking Lots, Overlooks and Raods, Acadia National Park (ACAD 318349)
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Bar Harbor, ME 04609

Bituminous Asphalt Paving Services for Latour Street – 2021
Infrastructure
Results
Castine, ME 04421

Hancock County Sheriff's Office Access
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Ellsworth, ME 04605

2021 Paving
Infrastructure
Results
Franklin, ME

ACAD 312255 Rehabilitate Schoodic Water and Wastewater Systems
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Winter Harbor, ME 04693

Bituminous Asphalt Paving Services for Water Street - 2021
Infrastructure
Results
Castine, ME 04421

Paving
Infrastructure
Post-Bid
$150,000 est. value
Hancock, ME

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Maintenance and Electrical Services for Ferry Terminal Transfer Bridges - Region 4
Renovation, Infrastructure
Post-Bid
Tremont, ME

Last Updated 09/21/2022 09:44 AM
Project Title

Mill Hill Bridge Replacement - Stonington - Deer Isle, Region 4

Physical Address View project details and contacts
City, State (County) Stonington, ME 04681   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,611,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must have completed, or successfully complete, a bridge prequalification, or project specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No. 2309401 WIN 022356.01 Location: In Hancock County, Mill Hill bridge is located on North Stonington Road/ South Deer Isle Road/ State Route 15 over Mill Pond Outlet on the Stonington - Deer Isle town line. Scope of Work: Mill Hill bridge replacement plus other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Andrew Lathe at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts.MDOT(@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Mill Hill Bridge Replacement - Stonington - Deer Isle, Region 4 Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accept a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents