Similar Projects
Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Collection System Rehabilitation - 2019
Results
Less than $518,683 est. value
OH

Elwynn, Deblin, Teakwood and Berdova Water Main Replacement Project
Results
Less than $959,567 est. value
Batavia, OH 45103

Fehr, Samoht Water Main Replacement Project
Results
Cincinnati, OH

Standby Water Main / Branch Replacement or Construction Above 2 Inches
Results
Cincinnati, OH

Waterworks System Improvements - Weaver road water petition
Results
$24,775 est. value
Batavia, OH

Mill Creek Potable Water Piping Improvements A
Results
Cincinnati, OH

Repair and Installation of Water Service Branches
Results
Cincinnati, OH

Kenridge, Brasher Water Main Replacement
Results
Cincinnati, OH

SR 132 Water Main Replacement (SR 48 To SR 28) Project
Results
$1,273,195 est. value
Batavia, OH

MCWWTP PAA Disinfection Upgrades
Results
Less than $800,000 est. value
Cincinnati, OH 45204

Fire Hydrant Flow Testing
Results
Cincinnati, OH

James E. Sauls Drive Transmission Main
Results
$1,261,166 est. value
OH 45103

Sedamsville Water Main Replacement/Relocation
Infrastructure
Results
Cincinnati, OH

Last Updated 03/29/2022 03:13 PM
Project Title

Mcpicken Road and Menno Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Batavia, OH 45103   (Clermont County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $834,928
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Project is generally defined as the replacement of approximately 2,242 lf of existing 6” cast iron water main with new 8” ductile iron water main & appurtenances along McPicken Drive and approximately 910 lf of existing 6” cast iron water main with new 8” ductile iron water main & appurtenances along Menno Drive located in Miami Township.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents