Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Pipeline Pig Service
Post-Bid
Less than $210,000 est. value
Tampa, FL 33601

Davis Islands Water Main Replacement
Results
Less than $5,240,000 est. value
Tampa, FL 33602

State Road 39 South Utility Extension
Results
$3,656,566 est. value
Plant City, FL 33564

Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

Polyethylene Water Meter Boxes and Covers (Sheltered Market Solicitation)
Term Contract
Results
Tampa, FL 33602

St. Augustine and Live Oak Water Main Replacement Project Phase II
Infrastructure
Post-Bid
Temple Terrace, FL 33617

Immediate Pipeline Repair and Reconstruction WORCS-11
Results
Less than $1,400,000 est. value
Tampa, FL 33601

Sunset Park Distribution Line Replacement (East)
Results
$2,103,727 est. value
Tampa, FL 33600

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Improvements Design-Build
Term Contract
Results
Less than $50,000,000 est. value
Tampa, FL

Citywide Meter Replacement
Results
Less than $710,100 est. value
Tampa, FL 33602

FY20 Water Utility Relocation
Results
$14,500,000 est. value
Tampa, FL 33602

CDBG University Square Water Replacement
Results
Temple Terrace, FL 33617

Last Updated 07/05/2021 06:27 AM
Project Title

Resilient Seat Gate and Tapping Valves, 2” Gate Valves and OS and Y Gate Valves (Sheltered Market Solicitation)

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resilient Seat Gate Vales ("Valves") provided under this specification shall be suitable for installation on ductile iron or cast iron pipe, and C-900 PVC. Valves shall be manufactured in accordance with AWWA C-509 or AWWA C515.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents