Similar Projects
Pavement Milling and Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Bidding
Nobleboro, Waldoboro, ME

Paving
Post-Bid
Jefferson, ME

Preconstruction Services for the Camden Highway and Bridges Project
Post-Bid
Camden, ME 23023

Academy Hill Road Reconstruction
Results
Newcastle, ME

Highway Reconstruction and Bridge Culvert Replacements
Results
Camden, ME 04843

(LCP) Light Capital Paving and Profile Milling
Results
Alna, Bristol, Camden, Cushing, Friendship, Hope, Newcastle, Pittston, Rockland, South Bristol, South Thomaston, Thomaston, Union, Waldoboro, Warren, Washington, Whitefield, Wiscasset, ME 04841

(LCP) Light Capital Paving
Results
Bowdoin, Bowdoinham, Dresden, Greene, Leeds, Litchfield, Manchester, Monmouth, Richmond, Wales, ME 04287

Pavement Milling, Cyclical Pavement Resurfacing, With Drainage Improvements
Results
Owls Head, Saint George, South Thomaston, Thomaston, ME

On Call Maintenance Paving/Located in Regions 1-5
Results

Road Grading
Results
Jefferson, ME

2020 Airport Improvements - Pavement Crack Repair and Fencing at Wiscasset Municipal Airport
Results
Less than $154,050 est. value
Wiscasset, ME

Road Grading of Unpaved Roads
Results
Bristol, ME

On Call Milling Machines and Grinders
Results

2020 Bond Paving
Results
Rockport, ME

Town Paving Services
Results
Hope, ME 04847

Last Updated 04/01/2021 06:12 AM
Project Title

Pavement Milling and Ultra-Thin Bonded Wearing Course

Physical Address View project details and contacts
City, State (County) Edgecomb, Newcastle, Rockport, ME (Knox, Lincoln Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Knox and Lincoln Counties: Project 2492500 is on US Route 1 beginning in Edgecomb 1.41 miles east of the Wiscasset town line and extending northeast 2.78 miles. Project 2492700 is on US Route 1 in Rockport beginning 0.06 miles north of the Rockland town line and extending north 1.19 miles and then beginning 0.07 miles north of the south intersection of Rockville Street and US Route 1 and extending north 2.51 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents