Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

New Judicial Center
New Construction - 65,000 SF
Design
Georgetown, KY

Corbin High School Multi-Purpose Athletic Buildings
New Construction, Infrastructure - 9,585 SF
Design
$2,000,000 CJ est. value
Corbin, KY 40701

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Asphalt Pavement & Roadway Rehab
Infrastructure
Bidding
$3,435,860 CJ est. value
Hopkinsville, KY 42240

Crystal Creek Subdivision Phase 4
Infrastructure
Post-Bid
Beattyville, KY 41311

Burger King #29711 / Grayson
New Construction, Infrastructure - 3,352 SF
Post-Bid
$1,000,000 CJ est. value
Grayson, KY 41143

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

New Judicial Center
New Construction
Results
Georgetown, KY 40324

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Arby's / Versailles
New Construction, Infrastructure - 2,460 SF
Construction
$800,000 CJ est. value
Versailles, KY 40383

UofL Health Medical Center South
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Shepherdsville, KY 40165

Agritech Research and Education Center - University of Pikeville
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Pikeville, KY 41501

Address Pavement Condition of I-64 Both Direction(S)
Infrastructure
Conception
$5,250,000 CJ est. value
Winchester, KY 40391

Last Updated 10/10/2022 02:31 PM
Project Title

Oldham County Judicial Center Phase 2

Physical Address View project details and contacts
City, State (County) La Grange, KY 40031   (Oldham County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each successful subcontractor will be required to purchase one complete set of plans, specifications, and bid manual and provide individual proof of insurance naming Wehr Constructors Inc., Sherman Carter Barnhart Architects, and the Oldham County Fiscal Court as additional insured under the policies. The insurance requirement shall be based upon contract amount. If the contract is less than $1 Million, the subcontractor shall maintain $1 Million in coverage. If the subcontract exceeds $1 Million, the amount of the coverage shall be $2 Million. Of that amount, $1 Million may be maintained as an "umbrella coverage". Questions Due: to Cameron Mathis (cmathis@wehrconstructors.com) and/or Brandon Boyer (bboyer@wehrconstructors.com) by 9/27/22

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents