Similar Projects
Elkhorn River Bank Stabilization - City of Scribner and Dodge County
Infrastructure
Conception
$1,000,000 CJ est. value
Scribner, NE 68057

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Johnson Crossing Academic Center Improvements
Addition, Demolition, Build-out, Infrastructure - 8,400 SF
Bidding
$400,000 CJ est. value
Fremont, NE 68025

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Ridge Drive Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Hooper, NE 68031

Rawhide Creek Trail, Fremont
Infrastructure
Results
Less than $5,000,000 est. value
NE

West 16th Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Keene Memorial Library Renovation - Bid Package 1
Addition, Renovation, Infrastructure - 34,340 SF
Construction
$6,200,000 CJ est. value
Fremont, NE 68025

Highway 77 Self-Storage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Inglewood, NE 68025

Paving Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Scribner, NE

Clarkson Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Fremont Public Schools New Elementary Schools
New Construction, Infrastructure - 210,000 SF
Construction
$17,980,000 CJ est. value
Fremont, NE 68025

North Lincoln Avenue and 29th Street Water Main Improvements
Infrastructure
Post-Bid
$300,000 est. value
Fremont, NE 68025

Last Updated 03/21/2023 09:43 AM
Project Title

Lincoln Ave Asphalt Overlay

Physical Address View project details and contacts
City, State (County) Fremont, NE 68025   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $943,336 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For all tools, labor and materials necessary to complete the work required for LINCOLN AVENUE ASPHALT OVERLAY as per the Plans and Specifications prepared by the Engineering Department and on file with the City Clerk. TOTAL ESTIMATED COST............$1,200,000.00 ESTIMATE OF QUANTITIES 3410 Tons of Asphalt. The work is generally described as asphalt, mill and overlay on Lincoln Avenue. AND, other associated work including curb ramps, adjust manholes, valves, rebuild inlets and erosion control. All work shall conform to the City of Fremont's Standard Specifications for Public Works Construction, latest edition. The contractor shall commence work as soon as practical after execution of the contract and complete the work no later than September 15, 2023. Contractors requesting further information regarding this project, please make request via email only to Veronica.Trujillo@FremontNE.gov.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents